Analisis Beban Kerja Karyawan di Departemen Produksi Menggunakan Metode Full Time Equivalent (FTE) PT. KLM

This study aims to analyze the workload level of employees in the production department of PT. KLM using the Full-Time Equivalent (FTE) method. This method is used to determine the optimal number of workers required to complete a task by considering the total workload and available working time. The results of the analysis show that operators in painting, finishing, sandblasting, PPIC (Production Planning and Inventory Control), and Quality Control are categorized as optimal or have a normal workload. However, welding operators face a shortage of staff, resulting in an underload workload condition, while cutting operators experience an excessive workload with surplus labor. Additionally, the Health, Safety, and Environment (HSE) staff also show an underload workload level

Authors

Institutions

Publication Details

Journal
Management Studies and Entrepreneurship Journal (MSEJ)
Published
2025-07-14
DOI
https://doi.org/10.37385/msej.v6i6.8689
Primary Topic
Management and Optimization Techniques
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Analisis Beban Kerja Karyawan di Departemen Produksi Menggunakan Metode Full Time Equivalent (FTE) PT. KLM

Muhammat Nur Rasit, Roziana Ainul Hidayati
Management Studies and Entrepreneurship Journal (MSEJ)
Management and Optimization Techniques
article

Analisis Beban Kerja Karyawan di Departemen Produksi Menggunakan Metode Full Time Equivalent (FTE) PT. KLM

Muhammat Nur Rasit, Roziana Ainul Hidayati
article en

Abstract

This study aims to analyze the workload level of employees in the production department of PT. KLM using the Full-Time Equivalent (FTE) method. This method is used to determine the optimal number of workers required to complete a task by considering the total workload and available working time. The results of the analysis show that operators in painting, finishing, sandblasting, PPIC (Production Planning and Inventory Control), and Quality Control are categorized as optimal or have a normal workload. However, welding operators face a shortage of staff, resulting in an underload workload condition, while cutting operators experience an excessive workload with surplus labor. Additionally, the Health, Safety, and Environment (HSE) staff also show an underload workload level

Management Studies and Entrepreneurship Journal (MSEJ)Vol. 6(6)
Universitas Muhammadiyah Gresik (ID)
Openalex Percentile: Top 74%
Management and Optimization Techniques
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.