Factors Influencing Dispute Negotiation Strategies in BIM-Based Construction Projects: A Critical Analysis

This study investigates the factors influencing dispute negotiation strategies (DNSs) in building information modeling (BIM)–based construction projects. Data were collected through surveys conducted with BIM professionals and analyzed using normalized mean analysis, Kruskal-Wallis H test, overlap analysis, rank agreement factor, confirmatory factor analysis, exploratory factor analysis, and partial least-squares structural equation modeling. The findings reveal 10 of 12 critical factors influence DNS across different stakeholders. Furthermore, unlike conventional construction projects, goodwill trust, contractual control, and contractual coordination do not significantly influence DNS in BIM-based construction projects. Additionally, losses associated with project stoppages must be removed to facilitate bilateral lock-in in moderating the relationship between DNS and contractual coordination as well as contractual control. These findings suggest a paradigm shift away from rigid contractual frameworks, favoring flexible, data-driven, and collaborative DNS in BIM-based construction projects. Nevertheless, the originality of this study lies in its investigation of DNS in BIM-based construction projects.

Authors

Institutions

Publication Details

Journal
Journal of Legal Affairs and Dispute Resolution in Engineering and Construction
Published
2025-07-14
DOI
https://doi.org/10.1061/jladah.ladr-1314
Citations
1
Primary Topic
BIM and Construction Integration
Type
article
Field-Weighted Citation Impact
1.01
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Factors Influencing Dispute Negotiation Strategies in BIM-Based Construction Projects: A Critical Analysis

Afiqah R. Radzi, Mohd Azrai Azman, Mohammed Algahtany, Rahimi A. Rahman et al.
1 citations
Journal of Legal Affairs and Dispute Resolution in Engineering and Construction
BIM and Construction Integration
1.01
article

Factors Influencing Dispute Negotiation Strategies in BIM-Based Construction Projects: A Critical Analysis

Afiqah R. Radzi, Mohd Azrai Azman, Mohammed Algahtany, Rahimi A. Rahman, Ahmad Rizal Alias
article en
1 citations

Abstract

This study investigates the factors influencing dispute negotiation strategies (DNSs) in building information modeling (BIM)–based construction projects. Data were collected through surveys conducted with BIM professionals and analyzed using normalized mean analysis, Kruskal-Wallis H test, overlap analysis, rank agreement factor, confirmatory factor analysis, exploratory factor analysis, and partial least-squares structural equation modeling. The findings reveal 10 of 12 critical factors influence DNS across different stakeholders. Furthermore, unlike conventional construction projects, goodwill trust, contractual control, and contractual coordination do not significantly influence DNS in BIM-based construction projects. Additionally, losses associated with project stoppages must be removed to facilitate bilateral lock-in in moderating the relationship between DNS and contractual coordination as well as contractual control. These findings suggest a paradigm shift away from rigid contractual frameworks, favoring flexible, data-driven, and collaborative DNS in BIM-based construction projects. Nevertheless, the originality of this study lies in its investigation of DNS in BIM-based construction projects.

Journal of Legal Affairs and Dispute Resolution in Engineering and ConstructionVol. 17(4)
Universiti Malaysia Pahang Al-Sultan Abdullah (MY), Northern Border University (SA), Daffodil International University (BD), Universiti Teknologi MARA (MY)
Openalex Percentile: Top 23%
BIM and Construction Integration
1.01
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.