Research on the diagnosis and evaluation technology of the whole life cycle cost of power grid transformer equipment

With the continuous development of grid equipment, how to achieve refined management of costs throughout the entire lifecycle has become a significant challenge for power grid enterprises. The lifecycle cost of grid equipment involves multiple stages, including initial investment, maintenance, operations, fault disposal, and decommissioning, with costs at these stages being interrelated and dynamically transmitted. Traditional cost management methods often overlook the interlinkages between these stages, resulting in low resource allocation efficiency. This paper combines multivariate regression analysis to conduct sensitivity analysis on the lifecycle costs of grid equipment, examining the impact of various factors on the total cost. Based on the sensitivity analysis, a cost optimization scheme is proposed. The research findings provide scientific support for the management and decision-making of grid equipment, offering significant practical value.

Authors

Publication Details

Published
2025-05-09
DOI
https://doi.org/10.1109/net-lc65482.2025.11070896
Primary Topic
Smart Grid and Power Systems
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Research on the diagnosis and evaluation technology of the whole life cycle cost of power grid transformer equipment

Shijin Qiu, Ying Wang, Mengzhe Liu, Yue Zhang et al.
Smart Grid and Power Systems
article

Research on the diagnosis and evaluation technology of the whole life cycle cost of power grid transformer equipment

Shijin Qiu, Ying Wang, Mengzhe Liu, Yue Zhang, Zhiyuan Zhang
article en

Abstract

With the continuous development of grid equipment, how to achieve refined management of costs throughout the entire lifecycle has become a significant challenge for power grid enterprises. The lifecycle cost of grid equipment involves multiple stages, including initial investment, maintenance, operations, fault disposal, and decommissioning, with costs at these stages being interrelated and dynamically transmitted. Traditional cost management methods often overlook the interlinkages between these stages, resulting in low resource allocation efficiency. This paper combines multivariate regression analysis to conduct sensitivity analysis on the lifecycle costs of grid equipment, examining the impact of various factors on the total cost. Based on the sensitivity analysis, a cost optimization scheme is proposed. The research findings provide scientific support for the management and decision-making of grid equipment, offering significant practical value.

Responsible consumption and production
Openalex Percentile: Top 85%
Smart Grid and Power Systems
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Research on the diagnosis and evaluation technology of the whole life cycle cost of power grid transformer equipment — Shijin Qiu, Ying Wang, et al. · (2025) | TGRS Research Map | TGRS