Green gutter as a nature-based solution for a mitigation and adaptation strategy in urban environments

The goal of this paper is to conduct an experimental study to evaluate the efficiency of an innovative green infrastructure named green gutter made of mineral wool as a prospective green wall to delay stormwater. The pilot is formed by an unplanted prismatic vertical column of metal filled with mineral wool with 4 meters in height, width 0,6 m, and depth 0,15 m. Along its elevation, 8 moisture sensors divided in 2 lines of 4 are embedded within the filling material to assess saturation levels, flow meters are installed in the inlet and outlet of the system. The system was tested with different flows and durations to simulate distinct rain events. The monitored parameters were peak flow reduction and, peak flow delay. From the results, it could be noted that the system's performance shows a consistent capacity to delay peak flows, on average in 15 min, but a limited capacity for peak flow reduction. Higher peak flow reductions ranging from 30% to 50% were obtained only for design rains of 10 min duration and 0.5 and 5 year return period, respectively. By effectively delaying peak flow the green gutter showed to be a promising solution to be used in stormwater strategies, focused on creating time lags of peak flows among subwatersheds.

Authors

Institutions

Publication Details

Journal
Integrated Environmental Assessment and Management
Published
2025-09-02
DOI
https://doi.org/10.1093/inteam/vjaf122
Primary Topic
Land Use and Ecosystem Services
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Green gutter as a nature-based solution for a mitigation and adaptation strategy in urban environments

Ludovica Bellani
Integrated Environmental Assessment and Management
Land Use and Ecosystem Services
article

Green gutter as a nature-based solution for a mitigation and adaptation strategy in urban environments

Ludovica Bellani
article en

Abstract

The goal of this paper is to conduct an experimental study to evaluate the efficiency of an innovative green infrastructure named green gutter made of mineral wool as a prospective green wall to delay stormwater. The pilot is formed by an unplanted prismatic vertical column of metal filled with mineral wool with 4 meters in height, width 0,6 m, and depth 0,15 m. Along its elevation, 8 moisture sensors divided in 2 lines of 4 are embedded within the filling material to assess saturation levels, flow meters are installed in the inlet and outlet of the system. The system was tested with different flows and durations to simulate distinct rain events. The monitored parameters were peak flow reduction and, peak flow delay. From the results, it could be noted that the system's performance shows a consistent capacity to delay peak flows, on average in 15 min, but a limited capacity for peak flow reduction. Higher peak flow reductions ranging from 30% to 50% were obtained only for design rains of 10 min duration and 0.5 and 5 year return period, respectively. By effectively delaying peak flow the green gutter showed to be a promising solution to be used in stormwater strategies, focused on creating time lags of peak flows among subwatersheds.

Integrated Environmental Assessment and Management
Politecnico di Torino (IT), Center for Clinical & Basic Research (DK), Leo Pharma (Denmark) (DK), Technical University of Denmark (DK)
Openalex Percentile: Top 84%
Land Use and Ecosystem Services
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.