A Greedy Algorithm for the Resource-Constrained ProjectScheduling Problem
The resource-constrained project scheduling problem (briefly RCPSP) is a general scheduling problem that includes precedence and resource constraints. Activities preemptions are not allowed. Resources are renewable and there is a unique way to perform the activities. The problem with renewable resources is NP-hard in the strong sense. We propose a new deterministic greedy algorithm. It is based on heuristics that use information obtained from a relaxing problem. The algorithm is tested with standard data sets given by Kolisch library PSPLIB for j60, j90, and j120 and found to be performing well.
Authors
- Е. Н. Гончаров (ORCID: https://orcid.org/0000-0001-6843-8971)
Institutions
- Russian Academy of Sciences (RU)
- Sobolev Institute of Mathematics (RU)
Publication Details
- Journal
- Journal of Applied and Industrial Mathematics
- Published
- 2024-12-01
- DOI
- https://doi.org/10.1134/s1990478924040057
- Primary Topic
- Resource-Constrained Project Scheduling
- Type
- article
- Field-Weighted Citation Impact
- 0.00