Zama Water Treatment Project: Optimisation using Project Management Techniques

This paper examines how project management techniques can be utilised as strategic tools to enhance infrastructure projects more efficiently and effectively. It refers mainly to the Zama water treatment project in South Africa. This research illustrates the efficacy of PERT (Program Evaluation and Review Technique), CPM (Critical Path Method), and project crashing in resolving the region's water quality and infrastructure problems. The primary objective is to optimise the Zama water treatment project's planning, monitoring, and control to ensure project success. Information was collected from Hydro Novo Ltd in collaboration with the Municipal Chairperson of Utility Services. The data provided in the tables facilitated the development of the project management model following the fundamental principles of these approaches. The model was solved with the assistance of QM for Windows. The solution revealed that the project duration could be reduced from 78,6 weeks (completion time) to 57 weeks, costing R6,212,500 additional. By crashing the project, the municipality ensures a quicker resolution to the water quality issues, significantly improving the social, economic, and quality of life conditions in the Zama community and supporting the stability and growth of local businesses. The sensitivity analysis suggests that reducing the project duration to 65 or 60 weeks can be viable. It would save a lot of time at an acceptable cost and minimise risks while providing substantial benefits to the community. Furthermore, the study demonstrates how project management tools can enhance the success of infrastructure projects in resource-limited areas, ultimately contributing to sustainable water management in South Africa.

Authors

Institutions

Publication Details

Published
2025-04-07
DOI
https://doi.org/10.46254/af6.20250199
Primary Topic
Construction Project Management and Performance
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Zama Water Treatment Project: Optimisation using Project Management Techniques

Eveth Nkeiruka Nwobodo-Anyadiegwu, Mmasefako Lucy Tlala
Construction Project Management and Performance
article

Zama Water Treatment Project: Optimisation using Project Management Techniques

Eveth Nkeiruka Nwobodo-Anyadiegwu, Mmasefako Lucy Tlala
article en

Abstract

This paper examines how project management techniques can be utilised as strategic tools to enhance infrastructure projects more efficiently and effectively. It refers mainly to the Zama water treatment project in South Africa. This research illustrates the efficacy of PERT (Program Evaluation and Review Technique), CPM (Critical Path Method), and project crashing in resolving the region's water quality and infrastructure problems. The primary objective is to optimise the Zama water treatment project's planning, monitoring, and control to ensure project success. Information was collected from Hydro Novo Ltd in collaboration with the Municipal Chairperson of Utility Services. The data provided in the tables facilitated the development of the project management model following the fundamental principles of these approaches. The model was solved with the assistance of QM for Windows. The solution revealed that the project duration could be reduced from 78,6 weeks (completion time) to 57 weeks, costing R6,212,500 additional. By crashing the project, the municipality ensures a quicker resolution to the water quality issues, significantly improving the social, economic, and quality of life conditions in the Zama community and supporting the stability and growth of local businesses. The sensitivity analysis suggests that reducing the project duration to 65 or 60 weeks can be viable. It would save a lot of time at an acceptable cost and minimise risks while providing substantial benefits to the community. Furthermore, the study demonstrates how project management tools can enhance the success of infrastructure projects in resource-limited areas, ultimately contributing to sustainable water management in South Africa.

University of Johannesburg (ZA)
Clean water and sanitation
Openalex Percentile: Top 81%
Construction Project Management and Performance
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.