Cost and Time Performance Evaluation Based on Earned Value Analysis Method

The execution of construction projects frequently encounters a range of challenges in the field, leading to deviations between the initial project plan and actual implementation, particularly in terms of time and cost performance. Such deviations may significantly affect the overall efficiency and effectiveness in achieving the intended project objectives. Consequently, there is a critical need for an evaluation method capable of providing a comprehensive and real-time assessment of project performance. This study aims to evaluate the performance of an infrastructure development initiative, namely the ABC toll road construction project, by employing the Earned Value Analysis (EVA) method. EVA integrates three key components—cost, schedule, and work performance—offering a quantitative framework to assess both cost efficiency and schedule adherence. The performance weights used in this study are derived from both planned values and actual on-site progress to reflect the true execution status. The data utilized in the analysis include the Budget Plan (Rencana Anggaran Biaya/RAB), planned S-curve, and weekly progress reports obtained during project implementation. The findings at the 67th week of project execution indicate an Actual Cost of Work Performed (ACWP) of Rp1,231,597,458,600.00, a Budgeted Cost of Work Performed (BCWP) of Rp1,109,547,260,000.00, and a Budgeted Cost of Work Scheduled (BCWS) of Rp1,570,000,000,000.00. The Cost Performance Index (CPI) value of 0.901 indicates that the project experienced a cost overrun of 9.9% compared to the planned budget (CPI < 1 signifies cost inefficiency).

Authors

Institutions

Publication Details

Journal
Journal of Civil Engineering and Planning
Published
2025-06-22
DOI
https://doi.org/10.37253/jcep.v6i1.10691
Primary Topic
Evaluation and Optimization Models
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Cost and Time Performance Evaluation Based on Earned Value Analysis Method

Junita Eka Susanti, Putri Ayu Dwiyana, Laila Putri Rahmadani
Journal of Civil Engineering and Planning
Evaluation and Optimization Models
article

Cost and Time Performance Evaluation Based on Earned Value Analysis Method

Junita Eka Susanti, Putri Ayu Dwiyana, Laila Putri Rahmadani
article en

Abstract

The execution of construction projects frequently encounters a range of challenges in the field, leading to deviations between the initial project plan and actual implementation, particularly in terms of time and cost performance. Such deviations may significantly affect the overall efficiency and effectiveness in achieving the intended project objectives. Consequently, there is a critical need for an evaluation method capable of providing a comprehensive and real-time assessment of project performance. This study aims to evaluate the performance of an infrastructure development initiative, namely the ABC toll road construction project, by employing the Earned Value Analysis (EVA) method. EVA integrates three key components—cost, schedule, and work performance—offering a quantitative framework to assess both cost efficiency and schedule adherence. The performance weights used in this study are derived from both planned values and actual on-site progress to reflect the true execution status. The data utilized in the analysis include the Budget Plan (Rencana Anggaran Biaya/RAB), planned S-curve, and weekly progress reports obtained during project implementation. The findings at the 67th week of project execution indicate an Actual Cost of Work Performed (ACWP) of Rp1,231,597,458,600.00, a Budgeted Cost of Work Performed (BCWP) of Rp1,109,547,260,000.00, and a Budgeted Cost of Work Scheduled (BCWS) of Rp1,570,000,000,000.00. The Cost Performance Index (CPI) value of 0.901 indicates that the project experienced a cost overrun of 9.9% compared to the planned budget (CPI < 1 signifies cost inefficiency).

Journal of Civil Engineering and PlanningVol. 6(1)
Sumatera Institute of Technology (ID)
Openalex Percentile: Top 80%
Evaluation and Optimization Models
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Cost and Time Performance Evaluation Based on Earned Value Analysis Method — Junita Eka Susanti, Putri Ayu Dwiyana, et al. · Journal of Civil Engineering and Planning (2025) | TGRS Research Map | TGRS