Extension of Time Claim Management Using Building Information Modeling

Delays are an integral part of construction project and result in a multitude of adverse effects on project performance leading to dismays among the stakeholders. In the case of delays caused by reasons beyond the construction contractor’s control, the contractor is entitled to an Extension of Time (EOT) after the approval by the stakeholders involved. EOT claim generation is a lengthy process that involves specialized skills and knowledge of construction contracts. Building Information Modelling (BIM) is a well-established field at the crossroads of simulation, modelling and analysis of construction projects. This study focused on developing a software solution for EOT claim management, capable of calculating delays and EOT entitlement to contractors as per the ‘As Planned vs. As Built’ method of delay analysis. The developed tool allows the calculation of EOT delay along with its visualization in 3D and 4D environments. The approach aimed at digitalizing the process of EOT claim management by minimizing human efforts.

Authors

Institutions

Publication Details

Published
2024-10-23
DOI
https://doi.org/10.1109/iec61018.2024.11063805
Primary Topic
BIM and Construction Integration
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Extension of Time Claim Management Using Building Information Modeling

Muhammad Ijaz, Abdul Malik, Abdur Rehman Nasir, Muhammad Usama Bin Maqsood
BIM and Construction Integration
article

Extension of Time Claim Management Using Building Information Modeling

Muhammad Ijaz, Abdul Malik, Abdur Rehman Nasir, Muhammad Usama Bin Maqsood
article en

Abstract

Delays are an integral part of construction project and result in a multitude of adverse effects on project performance leading to dismays among the stakeholders. In the case of delays caused by reasons beyond the construction contractor’s control, the contractor is entitled to an Extension of Time (EOT) after the approval by the stakeholders involved. EOT claim generation is a lengthy process that involves specialized skills and knowledge of construction contracts. Building Information Modelling (BIM) is a well-established field at the crossroads of simulation, modelling and analysis of construction projects. This study focused on developing a software solution for EOT claim management, capable of calculating delays and EOT entitlement to contractors as per the ‘As Planned vs. As Built’ method of delay analysis. The developed tool allows the calculation of EOT delay along with its visualization in 3D and 4D environments. The approach aimed at digitalizing the process of EOT claim management by minimizing human efforts.

University of Hertfordshire (GB), Technische Universität Berlin (DE), National University of Sciences and Technology (PK)
Climate action
Openalex Percentile: Top 68%
BIM and Construction Integration
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.