Coordinated Optimization of Solar and Wind Energy Storage in Industrial Parks Based on Linear Programming and Mixed Integer Programming Models
This paper addresses the optimization of operations within independent industrial parks and the determination of the optimal energy storage allocation for combined parks. Initially, a linear programming model is established to address the operational issues of the three parks when energy storage is not allocated. Subsequently, 50 kW/100 kWh energy storage systems are individually allocated to each park, and the resulting purchased electricity, discarded wind and solar energy, total electricity supply cost, and average unit electricity supply cost are calculated. Finally, a mixed integer programming model is employed to determine the optimal operational strategies and electricity purchasing plans for the individual energy storage allocations for each park. Furthermore, in the scenario of combined park operations, assuming the formation of a unified park comprising three parks, the economic operations without energy storage allocation are analyzed. Subsequently, the optimal energy storage allocation for the combined park is determined, resulting in a purchased electricity quantity of 7149.7196 kWh, a total electricity supply cost of 14661.5105 yuan, and an average unit electricity supply cost of 0.6269 yuan/kWh. The battery power upper limit is found to be 774 kW, and the battery capacity is 1469.1453 kWh.
Authors
- Yiming Zeng (ORCID: https://orcid.org/0000-0002-5004-4883)
Institutions
- Chongqing Technology and Business University (CN)
- Chongqing University of Education (CN)
Publication Details
- Published
- 2025-03-26
- DOI
- https://doi.org/10.1109/edpee65754.2025.00046
- Primary Topic
- Power Systems and Renewable Energy
- Type
- article
- Field-Weighted Citation Impact
- 0.00