Creation of mathematic model of definition of main dimensions of subsea construction vessel of new generation: influence of pipe-laying equipment

The article is devoted to the scientifically substantiated selection of the main dimensions of the FPSO for operation as a pipe-laying vessel on the Caspian shelf at the initial design stages. On the basis of practical experience of using specialized pipe-laying vessels it is proposed to use universal subsea engineering support vessels (SESV). A system analysis was carried out and a mathematical model was formed to determine the main dimensions of SESV when using pipe-laying equipment. The influence of pipe-laying operations and equipment on the main dimensions of SESV was assessed. On the basis of the research, the previously developed nomogram of formation of main dimensions of SESV taking into account the use of pipe-laying equipment has been supplemented. The model of optimization of the main dimensions of SESV obtained on the basis of the performed dependences and the developed nomogram was formed. With the help of this model the parameters of SESV are determined for pipe-laying operations in the Caspian Sea basin.

Authors

Institutions

Publication Details

Journal
Herald of the Odessa National Maritime University
Published
2025-06-02
DOI
https://doi.org/10.47049/2226-1893-2025-2-10-32
Primary Topic
Engineering Diagnostics and Reliability
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Creation of mathematic model of definition of main dimensions of subsea construction vessel of new generation: influence of pipe-laying equipment

Rauf Rzayev, А. В. Егоров, Oyrad Abdullayev, G. Hajinskiy
Herald of the Odessa National Maritime University
Engineering Diagnostics and Reliability
article

Creation of mathematic model of definition of main dimensions of subsea construction vessel of new generation: influence of pipe-laying equipment

Rauf Rzayev, А. В. Егоров, Oyrad Abdullayev, G. Hajinskiy
article en

Abstract

The article is devoted to the scientifically substantiated selection of the main dimensions of the FPSO for operation as a pipe-laying vessel on the Caspian shelf at the initial design stages. On the basis of practical experience of using specialized pipe-laying vessels it is proposed to use universal subsea engineering support vessels (SESV). A system analysis was carried out and a mathematical model was formed to determine the main dimensions of SESV when using pipe-laying equipment. The influence of pipe-laying operations and equipment on the main dimensions of SESV was assessed. On the basis of the research, the previously developed nomogram of formation of main dimensions of SESV taking into account the use of pipe-laying equipment has been supplemented. The model of optimization of the main dimensions of SESV obtained on the basis of the performed dependences and the developed nomogram was formed. With the help of this model the parameters of SESV are determined for pipe-laying operations in the Caspian Sea basin.

Herald of the Odessa National Maritime University(76)
Azerbaijan State Marine Academy (AZ), China Ocean Shipping (China) (CN), Caspian University (KZ), Odessa National Maritime University (UA)
Openalex Percentile: Top 82%
Engineering Diagnostics and Reliability
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.