Contract Management Strategies for Nuclear Power Projects Based on Fuzzy Evaluation and Machine Learning Algorithm

Nuclear power engineering projects have the characteristics of high engineering cost, complex contract structure, and long contract period. The contract management directly affects the cost of nuclear power projects. However, as a part of project management, contract management is different from project quality, safety, progress and other management with clear standard specifications. However, rare research works are conducted to deal with assessment of the success of contract management of nuclear projects using fuzzy methods and machine learning algorithms. This article explores the evaluation of contract management capability and efficiency in nuclear power engineering projects by developing an evaluation method for project management maturity. The index system for contract management evaluation is established using the full life cycle method and a fuzzy theory-based method. This article also uses machine learning algorithms such as XGBoost and Random Forest (RF) to verify the fuzzy methods, and rank top features of contract management strategies. Classification results show that XGBoost and Random Forest algorithms are cost effective and time saving. XGBoost algorithm achieves better classification accuracy of 95% compared to RF algorithm. Among the top five features affecting the success of a contract management strategy, program integrity achieved 0.122570 score followed by efficiency of dispute settlement with 0.113232. Models’ accuracy results and ranking score show that the optimized efficiency has potential to increase efficiency of contract management using large datasets on nuclear projects.

Authors

Institutions

Publication Details

Published
2025-03-14
DOI
https://doi.org/10.1145/3736426.3736506
Primary Topic
Underground infrastructure and sustainability
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Contract Management Strategies for Nuclear Power Projects Based on Fuzzy Evaluation and Machine Learning Algorithm

Jianbing Wen, Meimei You
Underground infrastructure and sustainability
article

Contract Management Strategies for Nuclear Power Projects Based on Fuzzy Evaluation and Machine Learning Algorithm

Jianbing Wen, Meimei You
article en

Abstract

Nuclear power engineering projects have the characteristics of high engineering cost, complex contract structure, and long contract period. The contract management directly affects the cost of nuclear power projects. However, as a part of project management, contract management is different from project quality, safety, progress and other management with clear standard specifications. However, rare research works are conducted to deal with assessment of the success of contract management of nuclear projects using fuzzy methods and machine learning algorithms. This article explores the evaluation of contract management capability and efficiency in nuclear power engineering projects by developing an evaluation method for project management maturity. The index system for contract management evaluation is established using the full life cycle method and a fuzzy theory-based method. This article also uses machine learning algorithms such as XGBoost and Random Forest (RF) to verify the fuzzy methods, and rank top features of contract management strategies. Classification results show that XGBoost and Random Forest algorithms are cost effective and time saving. XGBoost algorithm achieves better classification accuracy of 95% compared to RF algorithm. Among the top five features affecting the success of a contract management strategy, program integrity achieved 0.122570 score followed by efficiency of dispute settlement with 0.113232. Models’ accuracy results and ranking score show that the optimized efficiency has potential to increase efficiency of contract management using large datasets on nuclear projects.

China General Nuclear Power Corporation (China) (CN)
Openalex Percentile: Top 83%
Underground infrastructure and sustainability
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Contract Management Strategies for Nuclear Power Projects Based on Fuzzy Evaluation and Machine Learning Algorithm — Jianbing Wen, Meimei You · (2025) | TGRS Research Map | TGRS