Research on the application of progress management of intelligent highway platform based on BIM

For the extensive management of highway construction progress, which relies on manual labor and experience-based estimates, a highway project division table based on WBS is used to conduct a refined division of the project into units, divisions, and sub-divisions; Split the BIM model at the component level according to the standard specifications of EBS, and define the structure, format, and content of the data; Using EBS and engineering division for platform data exchange and sharing, it achieves 3D visualization and fine management of progress based on BIM models, solving the problems of low informatization level, poor data sharing ability, and high influence of subjective factors in traditional progress management. In combination with the constructed progress management module, the pilot application of the Majiapu-Jingyang Expressway Project in Shaanxi Province will be carried out to display the image progress, simulate and demonstrate the progress, compare and warn the progress, and make progress control decisions, so as to improve the refinement, visualization, and scientific progress management.

Authors

Institutions

Publication Details

Published
2025-03-14
DOI
https://doi.org/10.1145/3736426.3736459
Primary Topic
BIM and Construction Integration
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Research on the application of progress management of intelligent highway platform based on BIM

Zhao Bao-jun, Yong Wang, Shuai Li
BIM and Construction Integration
article

Research on the application of progress management of intelligent highway platform based on BIM

Zhao Bao-jun, Yong Wang, Shuai Li
article en

Abstract

For the extensive management of highway construction progress, which relies on manual labor and experience-based estimates, a highway project division table based on WBS is used to conduct a refined division of the project into units, divisions, and sub-divisions; Split the BIM model at the component level according to the standard specifications of EBS, and define the structure, format, and content of the data; Using EBS and engineering division for platform data exchange and sharing, it achieves 3D visualization and fine management of progress based on BIM models, solving the problems of low informatization level, poor data sharing ability, and high influence of subjective factors in traditional progress management. In combination with the constructed progress management module, the pilot application of the Majiapu-Jingyang Expressway Project in Shaanxi Province will be carried out to display the image progress, simulate and demonstrate the progress, compare and warn the progress, and make progress control decisions, so as to improve the refinement, visualization, and scientific progress management.

Xidian University (CN), Guangdong Institute of Intelligent Manufacturing (CN)
Sustainable cities and communities
Openalex Percentile: Top 83%
BIM and Construction Integration
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.