Prediction and early warning analysis of reservoir bank slopes based on anti-sliding stability evolution

• Stability evolution are obtained through creep analysis and multigrid method. • Prediction and early-warning by evolution of anti-sliding safety and deformation. • Early-warning indicators for left bank slope of Jinping I Hydropower Station. The stability of reservoir bank slopes during the impoundment period has become a critical issue in the construction and operation of large-scale hydropower projects. A predictive and early warning method for reservoir bank slopes is proposed, based on slip resistance stability evolution analysis. Using a refined three-dimensional numerical calculation model of the bank slope, the creep damage model is employed for simulation and analysis, enabling the derivation of stress field and strain field evolution from bank slope excavation to the long-term impoundment period. Subsequently, for the stress field of the bank slope at any given moment, the safety factors of the sliding blocks are determined by using the multigrid method and vector sum method. Accordingly, the evolutionary law of the sliding safety factor for the bank slope can be derived. By integrating the long-term stability evolution trend of the slope with specific engineering practices, the safety factors for graded warning can be determined. Based on the time correspondence, the graded warning moment and the deformation warning index for slope measurement points can be determined. In this study, the proposed method is applied to the left bank slope of the Jinping I Hydropower Station. The results indicate that from excavation to June 2022, the left bank slope exhibits a strong correlation with excavation elevation and the number of reservoir water cycles. The initial, maximum, and minimum safety factors are 2.01, 3.07, and 1.58, respectively. The deep fracture SL 44-1 serves as the primary stress-bearing slip surface of the left bank slope, while the safety margin of the fault f 42-9 and lamprophyre X is slightly insufficient. Based on the long-term stability evolution trend of the slope and in accordance with relevant standards, the safety factors for graded warning indicators— K w 1 , K w 2 , K w 3 , and K w 4 —are determined as 1.350, 1.325, 1.300, and 1.275, respectively. Correspondingly, the estimated warning times are 12/30/2066, 12/30/2084, and 12/30/2120. Accordingly, the deformation graded warning indexes for slope measurement points are established.

Authors

Institutions

Publication Details

Journal
Geoscience Frontiers
Published
2025-07-05
DOI
https://doi.org/10.1016/j.gsf.2025.102113
Citations
1
Primary Topic
Landslides and related hazards
Type
article
Field-Weighted Citation Impact
2.42

Funders

Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Prediction and early warning analysis of reservoir bank slopes based on anti-sliding stability evolution

Z. Qi, Yaoru Liu, Chao Gao, Shaokang Hou et al.
1 citations
Geoscience Frontiers
Landslides and related hazards
2.42
article

Prediction and early warning analysis of reservoir bank slopes based on anti-sliding stability evolution

Z. Qi, Yaoru Liu, Chao Gao, Shaokang Hou, Kai Zhang, Caiyong Wei, Wenyu Zhuang
article en
1 citations

Abstract

• Stability evolution are obtained through creep analysis and multigrid method. • Prediction and early-warning by evolution of anti-sliding safety and deformation. • Early-warning indicators for left bank slope of Jinping I Hydropower Station. The stability of reservoir bank slopes during the impoundment period has become a critical issue in the construction and operation of large-scale hydropower projects. A predictive and early warning method for reservoir bank slopes is proposed, based on slip resistance stability evolution analysis. Using a refined three-dimensional numerical calculation model of the bank slope, the creep damage model is employed for simulation and analysis, enabling the derivation of stress field and strain field evolution from bank slope excavation to the long-term impoundment period. Subsequently, for the stress field of the bank slope at any given moment, the safety factors of the sliding blocks are determined by using the multigrid method and vector sum method. Accordingly, the evolutionary law of the sliding safety factor for the bank slope can be derived. By integrating the long-term stability evolution trend of the slope with specific engineering practices, the safety factors for graded warning can be determined. Based on the time correspondence, the graded warning moment and the deformation warning index for slope measurement points can be determined. In this study, the proposed method is applied to the left bank slope of the Jinping I Hydropower Station. The results indicate that from excavation to June 2022, the left bank slope exhibits a strong correlation with excavation elevation and the number of reservoir water cycles. The initial, maximum, and minimum safety factors are 2.01, 3.07, and 1.58, respectively. The deep fracture SL 44-1 serves as the primary stress-bearing slip surface of the left bank slope, while the safety margin of the fault f 42-9 and lamprophyre X is slightly insufficient. Based on the long-term stability evolution trend of the slope and in accordance with relevant standards, the safety factors for graded warning indicators— K w 1 , K w 2 , K w 3 , and K w 4 —are determined as 1.350, 1.325, 1.300, and 1.275, respectively. Correspondingly, the estimated warning times are 12/30/2066, 12/30/2084, and 12/30/2120. Accordingly, the deformation graded warning indexes for slope measurement points are established.

Geoscience FrontiersVol. 16(5)
Beijing Solar Energy Research Institute (CN), Tsinghua University (CN)
National Natural Science Foundation of China
Climate action
Openalex Percentile: Top 11%
Landslides and related hazards
2.42
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.