The Effectiveness of Iot Use on Supply Chain Management Under Extreme Conditions in The Copper Cleaner Project

The success of a project cannot be separated from a series of activities that include planning, implementation and supervision stages. In Time control on a project, it is very necessary for a project to be able to complete the project on time or earlier than planned. The time control method used in this study is the Supply Chain Collaboration, Integration and Relations method. This research was conducted on the PT XYZ Mining Facility Development Project, Mimika Regency, Papua which aims to find out the project performance and get solutions to the problems that occur in the mining facility construction project. The data used in this study are Time Schedule, Construction Plan, Worker Supply Plan and weekly progress report. The implementation of IoT technology in logistics processes significantly improves the efficiency and effectiveness of the supply chain. In the copper cleaner project, the application of IoT was able to reduce delivery delays by an average of 13% and increase the reliability rate of delivery (on-time delivery) to 85%.

Authors

Institutions

Publication Details

Journal
Eduvest - Journal Of Universal Studies
Published
2025-07-05
DOI
https://doi.org/10.59188/eduvest.v5i7.50796
Primary Topic
ERP Systems Implementation and Impact
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

The Effectiveness of Iot Use on Supply Chain Management Under Extreme Conditions in The Copper Cleaner Project

Inavonna Inavonna, Darmawan Pontan, Bambang Endro Yuwono, Nyoman Oka Wahyudhi
1 links
Eduvest - Journal Of Universal Studies
ERP Systems Implementation and Impact
article

The Effectiveness of Iot Use on Supply Chain Management Under Extreme Conditions in The Copper Cleaner Project

Inavonna Inavonna, Darmawan Pontan, Bambang Endro Yuwono, Nyoman Oka Wahyudhi
article en

Abstract

The success of a project cannot be separated from a series of activities that include planning, implementation and supervision stages. In Time control on a project, it is very necessary for a project to be able to complete the project on time or earlier than planned. The time control method used in this study is the Supply Chain Collaboration, Integration and Relations method. This research was conducted on the PT XYZ Mining Facility Development Project, Mimika Regency, Papua which aims to find out the project performance and get solutions to the problems that occur in the mining facility construction project. The data used in this study are Time Schedule, Construction Plan, Worker Supply Plan and weekly progress report. The implementation of IoT technology in logistics processes significantly improves the efficiency and effectiveness of the supply chain. In the copper cleaner project, the application of IoT was able to reduce delivery delays by an average of 13% and increase the reliability rate of delivery (on-time delivery) to 85%.

Eduvest - Journal Of Universal StudiesVol. 5(7)
Universitas Trisakti (ID)
Openalex Percentile: Top 72%
ERP Systems Implementation and Impact
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.