Analysis of Oria Abraka 33/11 kV Power Sub-Station: A Case for Sustainable Power Supply

Frequent power outages in Nigeria's distribution network continue to hinder economic growth and industrial productivity.This study evaluates the reliability and performance of the Oria Abraka 33/11 kV substation in Delta State, Nigeria, to analyze power availability trends and propose improvement strategies.Daily power data, including power delivery, electric current, and outage hours, were obtained from the Benin Electricity Distribution Company (BEDC) for 2017-2022 and analyzed using Microsoft Excel for trend assessment and Python for power flow visualization.Findings reveal that power availability remains critically low, with January 2020 recording the highest monthly supply (207 hours, 6.68 hours per day), while 2022 had the highest annual power availability (1678 hours, 19.2%), reflecting persistent supply inadequacies.The total monthly available power peaked at 147.9 MW in December 2022, but yearly current delivery declined from 13,783 A in 2017 to 12,478 A in 2021, suggesting infrastructural constraints or load shedding.Fault Tree Analysis (FTA) identified key outage contributors, including transformer overloading, delayed switching, and high transmission losses, while power flow analysis highlighted voltage drops exceeding 43.3 V under peak loads.Unlike broader grid-wide studies, this research applies quantitative fault and power flow assessments at the substation level, revealing inefficiencies such as overloaded conductors, excessive power dissipation (0.5 MW loss at peak current), and prolonged restoration times (CAIDI: 28.31 hours).A comparative analysis with substations like Ugbowo 33/11 kV (Nigeria) and UK networks underscores the need for predictive maintenance, transformer capacity upgrades, and smart grid integration.These findings provide actionable insights for utilities, policymakers, and regulators to enhance power reliability across Nigeria and similar developing regions.

Authors

Publication Details

Journal
NIPES Journal of Science and Technology Research
Published
2025-04-25
DOI
https://doi.org/10.37933/nipes/7.1.2025.17
Primary Topic
Energy and Environment Impacts
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Analysis of Oria Abraka 33/11 kV Power Sub-Station: A Case for Sustainable Power Supply

Ufuoma Jeffrey Okieke, Eyenubo Ogheneakpobo Jonathan, Obuseh Emmanuel Ewere, Ebisine Ebimene Ezekiel et al.
NIPES Journal of Science and Technology Research
Energy and Environment Impacts
article

Analysis of Oria Abraka 33/11 kV Power Sub-Station: A Case for Sustainable Power Supply

Ufuoma Jeffrey Okieke, Eyenubo Ogheneakpobo Jonathan, Obuseh Emmanuel Ewere, Ebisine Ebimene Ezekiel, Okpare Anthony Onogharigho
article en

Abstract

Frequent power outages in Nigeria's distribution network continue to hinder economic growth and industrial productivity.This study evaluates the reliability and performance of the Oria Abraka 33/11 kV substation in Delta State, Nigeria, to analyze power availability trends and propose improvement strategies.Daily power data, including power delivery, electric current, and outage hours, were obtained from the Benin Electricity Distribution Company (BEDC) for 2017-2022 and analyzed using Microsoft Excel for trend assessment and Python for power flow visualization.Findings reveal that power availability remains critically low, with January 2020 recording the highest monthly supply (207 hours, 6.68 hours per day), while 2022 had the highest annual power availability (1678 hours, 19.2%), reflecting persistent supply inadequacies.The total monthly available power peaked at 147.9 MW in December 2022, but yearly current delivery declined from 13,783 A in 2017 to 12,478 A in 2021, suggesting infrastructural constraints or load shedding.Fault Tree Analysis (FTA) identified key outage contributors, including transformer overloading, delayed switching, and high transmission losses, while power flow analysis highlighted voltage drops exceeding 43.3 V under peak loads.Unlike broader grid-wide studies, this research applies quantitative fault and power flow assessments at the substation level, revealing inefficiencies such as overloaded conductors, excessive power dissipation (0.5 MW loss at peak current), and prolonged restoration times (CAIDI: 28.31 hours).A comparative analysis with substations like Ugbowo 33/11 kV (Nigeria) and UK networks underscores the need for predictive maintenance, transformer capacity upgrades, and smart grid integration.These findings provide actionable insights for utilities, policymakers, and regulators to enhance power reliability across Nigeria and similar developing regions.

NIPES Journal of Science and Technology ResearchVol. 7(1)
Responsible consumption and production
Openalex Percentile: Top 88%
Energy and Environment Impacts
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.