Implementation of Tecnomatix Plant Simulation for assembly lines supply

Simulations play a vital role in today's world, especially for processes in large enterprises such as car assembly in the automotive industry. A model has been created that imitates the behavior of a real car assembly line. To make the model, a simulation software called Tecnomatix Plant Simulation was used, blocks from a library were used, and the model's behavior was also programmed. Based on the two simulations, Experiment 2 showed better results than Experiment 1, visible from the higher values reached in the simulation. Changes in the timing of material transport using AGVs had a good effect on the simulation outcomes. In Experiment 2, there was an increase in the working time of the assembly stations and a decrease in waiting and blocking times, which indicates an improvement in their efficiency. A comparison of the working portion of AGVs between the two experiments showed that Experiment 2 had better results. AGVs in Experiment 2 completed more orders per day in comparison to Experiment 1.

Authors

Publication Details

Journal
Transport & Logistics the International Journal
Published
2024-12-21
DOI
https://doi.org/10.46544/tnl.v24n57.06
Primary Topic
Assembly Line Balancing Optimization
Type
article
Field-Weighted Citation Impact
0.00

Funders

Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Implementation of Tecnomatix Plant Simulation for assembly lines supply

Lucia Čabaníková, Aleš Slíva, Bohdana Bobinics
Transport & Logistics the International Journal
Assembly Line Balancing Optimization
article

Implementation of Tecnomatix Plant Simulation for assembly lines supply

Lucia Čabaníková, Aleš Slíva, Bohdana Bobinics
article en

Abstract

Simulations play a vital role in today's world, especially for processes in large enterprises such as car assembly in the automotive industry. A model has been created that imitates the behavior of a real car assembly line. To make the model, a simulation software called Tecnomatix Plant Simulation was used, blocks from a library were used, and the model's behavior was also programmed. Based on the two simulations, Experiment 2 showed better results than Experiment 1, visible from the higher values reached in the simulation. Changes in the timing of material transport using AGVs had a good effect on the simulation outcomes. In Experiment 2, there was an increase in the working time of the assembly stations and a decrease in waiting and blocking times, which indicates an improvement in their efficiency. A comparison of the working portion of AGVs between the two experiments showed that Experiment 2 had better results. AGVs in Experiment 2 completed more orders per day in comparison to Experiment 1.

Transport & Logistics the International JournalVol. 24(57)
European Commission, Kultúrna a Edukacná Grantová Agentúra MŠVVaŠ SR, Vedecká Grantová Agentúra MŠVVaŠ SR a SAV, Ostravská Univerzita v Ostravě
Openalex Percentile: Top 56%
Assembly Line Balancing Optimization
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.