Efficiency of the combined pile-raft foundation

It is well known that a raft foundation is, in most cases, a more economical alternative to a conventional pile foundation. The concept of incorporating a raft into a piled system is not new and has been implemented in foundation design in several Western countries. However, the practical implementation of this concept remains limited and largely absent. Ukrainian design codes only mention the existence of combined pile-raft foundations (CPRFs) and the possibility of their application. In CPRFs, both components—the raft and the piles—act as load-bearing elements, and their design must follow one of two approaches, depending on which component serves as the primary structural element. The first approach treats the raft on natural soil as the main foundation system, with piles added to improve its functional performance. In this case, piles are used to reduce and equalize the raft’s settlement and to lower the reactive pressure beneath the raft base. The second approach considers the piles as the main load-bearing elements, with the raft incorporated to reduce the total number of piles. This type of CPRF can be particularly effective in cases of complex soil stratification, where at depths of 10–15 meters, there are thick lenses of weak soil, making traditional pile foundations require excessively long piles. This paper demonstrates, using a specific design case of a pile foundation, the feasibility of implementing an alternative solution in the form of a combined pile-raft foundation. The structural analysis model of the building was developed as a spatial multi-element system. The raft was modeled as a slab on an elastic foundation with a variable modulus of subgrade reaction across the plan. The design parameters of the model were determined analytically and through software, using the GRUNT subroutine of the LIRA-SAPPHIRE 2024 software package. The implemented alternative CPRF solution proved to be both feasible and efficient, satisfying all deformation and stability requirements for both the soil base and the piles. With minor modifications to the raft design, the number of piles was reduced from 290 to 190.

Authors

Institutions

Publication Details

Journal
Building constructions Theory and Practice
Published
2025-06-28
DOI
https://doi.org/10.32347/2522-4182.16.2025.123-134
Primary Topic
Industrial Engineering and Technologies
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Efficiency of the combined pile-raft foundation

Volodymyr Kripak, Vira Koliakova, Daniiil Kuzmenko
1 links
Building constructions Theory and Practice
Industrial Engineering and Technologies
article

Efficiency of the combined pile-raft foundation

Volodymyr Kripak, Vira Koliakova, Daniiil Kuzmenko
article en

Abstract

It is well known that a raft foundation is, in most cases, a more economical alternative to a conventional pile foundation. The concept of incorporating a raft into a piled system is not new and has been implemented in foundation design in several Western countries. However, the practical implementation of this concept remains limited and largely absent. Ukrainian design codes only mention the existence of combined pile-raft foundations (CPRFs) and the possibility of their application. In CPRFs, both components—the raft and the piles—act as load-bearing elements, and their design must follow one of two approaches, depending on which component serves as the primary structural element. The first approach treats the raft on natural soil as the main foundation system, with piles added to improve its functional performance. In this case, piles are used to reduce and equalize the raft’s settlement and to lower the reactive pressure beneath the raft base. The second approach considers the piles as the main load-bearing elements, with the raft incorporated to reduce the total number of piles. This type of CPRF can be particularly effective in cases of complex soil stratification, where at depths of 10–15 meters, there are thick lenses of weak soil, making traditional pile foundations require excessively long piles. This paper demonstrates, using a specific design case of a pile foundation, the feasibility of implementing an alternative solution in the form of a combined pile-raft foundation. The structural analysis model of the building was developed as a spatial multi-element system. The raft was modeled as a slab on an elastic foundation with a variable modulus of subgrade reaction across the plan. The design parameters of the model were determined analytically and through software, using the GRUNT subroutine of the LIRA-SAPPHIRE 2024 software package. The implemented alternative CPRF solution proved to be both feasible and efficient, satisfying all deformation and stability requirements for both the soil base and the piles. With minor modifications to the raft design, the number of piles was reduced from 290 to 190.

Building constructions Theory and Practice(16)
Kyiv National University of Construction and Architecture (UA)
Openalex Percentile: Top 85%
Industrial Engineering and Technologies
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.