A Strategic AHP-Based Framework for Mitigating Delays in Road Construction Projects in the Philippines

Delays in road construction projects pose significant challenges in the Philippines, resulting in increased costs, project overruns, and unmet infrastructure goals. Common causes include poor financial management, inadequate subcontractor performance, deficient planning, and regulatory bottlenecks. This study aims to develop a comprehensive and data-driven framework to mitigate construction delays using the Analytical Hierarchy Process (AHP). The methodology integrates literature review, expert surveys, and pairwise comparisons to identify and prioritize critical delay factors. Experts from the Department of Public Works and Highways (DPWH), private contractors, and academia contributed to the AHP model. The results highlight seven major factor groups: client-related, contractor-related, consultant-related, materials, labor and equipment, contractual issues, and external influences. AHP analysis identified financial management, planning and scheduling, and regulatory coordination as the most impactful causes. Based on these findings, a strategic framework was developed and visualized using a Fishbone Diagram to present mitigation strategies tailored to each factor. While environmental engineering principles—such as material efficiency, energy use optimization, and impact assessments—are acknowledged, they serve as guiding themes rather than formal components of the framework. The study offers practical, stakeholder-validated recommendations for both pre- and post-construction phases, including real-time monitoring, risk anticipation, and improved multi-agency coordination. This framework provides a scalable tool for DPWH and related agencies to improve infrastructure delivery while supporting long-term sustainability goals.

Authors

Institutions

Publication Details

Journal
Future Transportation
Published
2025-07-01
DOI
https://doi.org/10.3390/futuretransp5030080
Primary Topic
Construction Project Management and Performance
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

A Strategic AHP-Based Framework for Mitigating Delays in Road Construction Projects in the Philippines

Jerome G. Gacu, Cris Edward F. Monjardin, Edgar M. Adina, Dario Landa-Silva et al.
Future Transportation
Construction Project Management and Performance
article

A Strategic AHP-Based Framework for Mitigating Delays in Road Construction Projects in the Philippines

Jerome G. Gacu, Cris Edward F. Monjardin, Edgar M. Adina, Dario Landa-Silva, Bernard S. Villaverde, Divina R. Gonzales, Jolina Marie O. Pedron
article en

Abstract

Delays in road construction projects pose significant challenges in the Philippines, resulting in increased costs, project overruns, and unmet infrastructure goals. Common causes include poor financial management, inadequate subcontractor performance, deficient planning, and regulatory bottlenecks. This study aims to develop a comprehensive and data-driven framework to mitigate construction delays using the Analytical Hierarchy Process (AHP). The methodology integrates literature review, expert surveys, and pairwise comparisons to identify and prioritize critical delay factors. Experts from the Department of Public Works and Highways (DPWH), private contractors, and academia contributed to the AHP model. The results highlight seven major factor groups: client-related, contractor-related, consultant-related, materials, labor and equipment, contractual issues, and external influences. AHP analysis identified financial management, planning and scheduling, and regulatory coordination as the most impactful causes. Based on these findings, a strategic framework was developed and visualized using a Fishbone Diagram to present mitigation strategies tailored to each factor. While environmental engineering principles—such as material efficiency, energy use optimization, and impact assessments—are acknowledged, they serve as guiding themes rather than formal components of the framework. The study offers practical, stakeholder-validated recommendations for both pre- and post-construction phases, including real-time monitoring, risk anticipation, and improved multi-agency coordination. This framework provides a scalable tool for DPWH and related agencies to improve infrastructure delivery while supporting long-term sustainability goals.

Future TransportationVol. 5(3)
Mapúa University (PH), Romblon State University (PH)
Openalex Percentile: Top 82%
Construction Project Management and Performance
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.