Genetic algorithm solving the scheduling problem of large-scale power grid material quality inspection bases under multiple constraints

A mathematical programming model is constructed for the scheduling problem of large-scale power grid material quality inspection bases under complex and multi constraint conditions, with the completion time of material inspection, equipment utilization rate of the base, and total equipment load as multi-objective performance indicators. Based on the characteristics of the problem, a genetic algorithm is proposed as a tool for solving, and the encoding and decoding in the algorithm are specially designed for the detection base to ensure the generation of feasible solutions; Introducing roulette wheel to select populations, combining the characteristics of the problem to randomly mutate chromosomes, and using POX for chromosome crossover, in order to obtain the optimal solution to the problem. The proposed method effectively solves the scheduling problem of the testing base and greatly improves its operational efficiency by using the current quality testing example of dry-type transformers in the base for verification.

Authors

Institutions

Publication Details

Journal
ITM Web of Conferences
Published
2025-01-01
DOI
https://doi.org/10.1051/itmconf/20257701016
Primary Topic
Scheduling and Optimization Algorithms
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Genetic algorithm solving the scheduling problem of large-scale power grid material quality inspection bases under multiple constraints

Yongqiang Chen, Lin Li
ITM Web of Conferences
Scheduling and Optimization Algorithms
article

Genetic algorithm solving the scheduling problem of large-scale power grid material quality inspection bases under multiple constraints

Yongqiang Chen, Lin Li
article en

Abstract

A mathematical programming model is constructed for the scheduling problem of large-scale power grid material quality inspection bases under complex and multi constraint conditions, with the completion time of material inspection, equipment utilization rate of the base, and total equipment load as multi-objective performance indicators. Based on the characteristics of the problem, a genetic algorithm is proposed as a tool for solving, and the encoding and decoding in the algorithm are specially designed for the detection base to ensure the generation of feasible solutions; Introducing roulette wheel to select populations, combining the characteristics of the problem to randomly mutate chromosomes, and using POX for chromosome crossover, in order to obtain the optimal solution to the problem. The proposed method effectively solves the scheduling problem of the testing base and greatly improves its operational efficiency by using the current quality testing example of dry-type transformers in the base for verification.

ITM Web of ConferencesVol. 77
Electric Power Research Institute (US), State Grid Corporation of China (China) (CN)
Openalex Percentile: Top 78%
Scheduling and Optimization Algorithms
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Genetic algorithm solving the scheduling problem of large-scale power grid material quality inspection bases under multiple constraints — Yongqiang Chen, Lin Li · ITM Web of Conferences (2025) | TGRS Research Map | TGRS