Explaining the high skill of reservoir computing methods in El Niño prediction

Abstract. Accurate prediction of the extreme phases of the El Niño–Southern Oscillation (ENSO) is important to mitigate the socioeconomic impacts of this phenomenon. It has long been thought that prediction skill was limited to a 6-month lead time. However, machine learning methods have shown to have skill at lead times of up to 21 months. In this paper, we aim to explain for one class of such methods, i.e. reservoir computers (RCs), the origin of this high skill. Using a conditional nonlinear optimal perturbation (CNOP) approach, we compare the initial error propagation in a deterministic Zebiak–Cane (ZC) ENSO model and that in an RC trained on synthetic observations derived from a stochastic ZC model. Optimal initial perturbations at long lead times in the RC involve both sea surface temperature and thermocline anomalies, which leads to decreased error propagation compared to the ZC model, where mainly thermocline anomalies dominate the optimal initial perturbations. This reduced error propagation allows the RC to provide a higher skill at long lead times than the deterministic ZC model.

Authors

Institutions

Publication Details

Journal
Nonlinear processes in geophysics
Published
2025-07-01
DOI
https://doi.org/10.5194/npg-32-201-2025
Citations
2
Primary Topic
Neural Networks and Reservoir Computing
Type
article
Field-Weighted Citation Impact
4.96

Funders

Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Explaining the high skill of reservoir computing methods in El Niño prediction

Claudia Wieners, Henk A. Dijkstra, Francesco Guardamagna
2 citations
Nonlinear processes in geophysics
Neural Networks and Reservoir Computing
4.96
article

Explaining the high skill of reservoir computing methods in El Niño prediction

Claudia Wieners, Henk A. Dijkstra, Francesco Guardamagna
article en
2 citations

Abstract

Abstract. Accurate prediction of the extreme phases of the El Niño–Southern Oscillation (ENSO) is important to mitigate the socioeconomic impacts of this phenomenon. It has long been thought that prediction skill was limited to a 6-month lead time. However, machine learning methods have shown to have skill at lead times of up to 21 months. In this paper, we aim to explain for one class of such methods, i.e. reservoir computers (RCs), the origin of this high skill. Using a conditional nonlinear optimal perturbation (CNOP) approach, we compare the initial error propagation in a deterministic Zebiak–Cane (ZC) ENSO model and that in an RC trained on synthetic observations derived from a stochastic ZC model. Optimal initial perturbations at long lead times in the RC involve both sea surface temperature and thermocline anomalies, which leads to decreased error propagation compared to the ZC model, where mainly thermocline anomalies dominate the optimal initial perturbations. This reduced error propagation allows the RC to provide a higher skill at long lead times than the deterministic ZC model.

Nonlinear processes in geophysicsVol. 32(2)
University of Applied Sciences Utrecht (NL), Utrecht University (NL)
Nederlandse Organisatie voor Wetenschappelijk Onderzoek
Openalex Percentile: Top 5%
Neural Networks and Reservoir Computing
4.96
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Explaining the high skill of reservoir computing methods in El Niño prediction — Claudia Wieners, Henk A. Dijkstra, et al. · Nonlinear processes in geophysics (2025) | TGRS Research Map | TGRS