Planning Of The Coiled Tubing Gas Lift Method To Overcome Esp Start-Up Failure In Well Ppa-003

The PPA-003 well in the Puspa Structure, Jambi Field, faces technical challenges due to the start-up failure of the Electric Submersible Pump (ESP) caused by the presence of heavy complex fluids. This condition hampers the initial production process and reduces the operational efficiency of the well. This study aims to design a nitrogen (N?) injection method through coiled tubing applied alongside the ESP start-up as a solution to lift the heavy complex fluids and enable the well to flow stably. The proposed approach involves using coiled tubing to inject N? into the well during the start-up process, thereby reducing the pressure gradient inside the tubing and lowering the total dynamic head (TDH) that must be supported by the ESP pump. Once the well flows and stable flow is achieved, the coiled tubing will be removed, and the operation will continue solely with ESP support. This study includes a technical analysis of the causes of start-up failure, N? injection design, ESP performance evaluation, and well flow simulation. The research results indicate that this method is effective in overcoming start-up obstacles by reducing the density of the heavy mud (kill fluid), allowing the ESP to operate within the equipment's operational limits. The recommendations from this study are expected to serve as a reference for addressing similar challenges in other wells, particularly in the Jambi Field area.

Authors

Publication Details

Journal
Cerdika Jurnal Ilmiah Indonesia
Published
2025-06-24
DOI
https://doi.org/10.59141/cerdika.v5i6.2598
Primary Topic
Oil and Gas Production Techniques
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Planning Of The Coiled Tubing Gas Lift Method To Overcome Esp Start-Up Failure In Well Ppa-003

Kurniawan Triyo Widodo
1 links
Cerdika Jurnal Ilmiah Indonesia
Oil and Gas Production Techniques
article

Planning Of The Coiled Tubing Gas Lift Method To Overcome Esp Start-Up Failure In Well Ppa-003

Kurniawan Triyo Widodo
article en

Abstract

The PPA-003 well in the Puspa Structure, Jambi Field, faces technical challenges due to the start-up failure of the Electric Submersible Pump (ESP) caused by the presence of heavy complex fluids. This condition hampers the initial production process and reduces the operational efficiency of the well. This study aims to design a nitrogen (N?) injection method through coiled tubing applied alongside the ESP start-up as a solution to lift the heavy complex fluids and enable the well to flow stably. The proposed approach involves using coiled tubing to inject N? into the well during the start-up process, thereby reducing the pressure gradient inside the tubing and lowering the total dynamic head (TDH) that must be supported by the ESP pump. Once the well flows and stable flow is achieved, the coiled tubing will be removed, and the operation will continue solely with ESP support. This study includes a technical analysis of the causes of start-up failure, N? injection design, ESP performance evaluation, and well flow simulation. The research results indicate that this method is effective in overcoming start-up obstacles by reducing the density of the heavy mud (kill fluid), allowing the ESP to operate within the equipment's operational limits. The recommendations from this study are expected to serve as a reference for addressing similar challenges in other wells, particularly in the Jambi Field area.

Cerdika Jurnal Ilmiah IndonesiaVol. 5(6)
Openalex Percentile: Top 81%
Oil and Gas Production Techniques
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Planning Of The Coiled Tubing Gas Lift Method To Overcome Esp Start-Up Failure In Well Ppa-003 — Kurniawan Triyo Widodo · Cerdika Jurnal Ilmiah Indonesia (2025) | TGRS Research Map | TGRS