Probability Analysis of Overtopping During Construction Period of Dam Based on Improved Interval Non-Probabilistic Reliability

Probabilistic analysis of overtopping is an important aspect of dam construction, and the uncertainty in the construction progress complicates the calculation of overtopping probabilities. Construction progress is significantly influenced by human factors, making it difficult to assign an accurate probability distribution. Although the interval non-probabilistic reliability (INPR) method can estimate the likelihood of events with unknown probability distributions, its calculation results for the overtopping probability have significant errors. To improve the rationality of the results, we developed a method that adopted flood frequency of the upstream flood level to correct the traditional INPR calculations, developing an improved model. Taking the Qianping Reservoir as an example, the overtopping probabilities for three construction schedules were calculated, and the results were compared with a flood routing calculation. The results indicated that the improved approach significantly improves the rationality of the calculations, and the results effectively reflected the impact of construction progress uncertainty on overtopping probabilities.

Authors

Institutions

Publication Details

Journal
Applied Sciences
Published
2025-06-27
DOI
https://doi.org/10.3390/app15137242
Primary Topic
Dam Engineering and Safety
Type
article
Field-Weighted Citation Impact
0.00

Funders

Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Probability Analysis of Overtopping During Construction Period of Dam Based on Improved Interval Non-Probabilistic Reliability

Zongkun Li, Jianyou Wang, Wei Ge, Yutie Jiao et al.
1 links
Applied Sciences
Dam Engineering and Safety
article

Probability Analysis of Overtopping During Construction Period of Dam Based on Improved Interval Non-Probabilistic Reliability

Zongkun Li, Jianyou Wang, Wei Ge, Yutie Jiao, Fuheng Ma, Xinyan Guo, Heqiang Sun, Yadong Zhang
article en

Abstract

Probabilistic analysis of overtopping is an important aspect of dam construction, and the uncertainty in the construction progress complicates the calculation of overtopping probabilities. Construction progress is significantly influenced by human factors, making it difficult to assign an accurate probability distribution. Although the interval non-probabilistic reliability (INPR) method can estimate the likelihood of events with unknown probability distributions, its calculation results for the overtopping probability have significant errors. To improve the rationality of the results, we developed a method that adopted flood frequency of the upstream flood level to correct the traditional INPR calculations, developing an improved model. Taking the Qianping Reservoir as an example, the overtopping probabilities for three construction schedules were calculated, and the results were compared with a flood routing calculation. The results indicated that the improved approach significantly improves the rationality of the calculations, and the results effectively reflected the impact of construction progress uncertainty on overtopping probabilities.

Applied SciencesVol. 15(13)
Zhengzhou University (CN), Nanjing Hydraulic Research Institute (CN), Yellow River Institute of Hydraulic Research (CN)
National Natural Science Foundation of China, China Postdoctoral Science Foundation, Natural Science Foundation of Henan Province
Openalex Percentile: Top 84%
Dam Engineering and Safety
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.