Alternative DO-178C Verification Workflow for Enhanced Productivity
In this paper, we describe an innovative V&V approach using the SCADE product, enabling significant reduction of effort while preserving compliance with DO-178C/DO-331. This new approach relies on a unique capability: automatic generation of Low-Level Tests. Details about savings will be provided to show how we can reduce costs, speed up certifications, and bring products to the market faster. We will conclude by summarizing the actual benefits and describing ongoing work to bring other savings in the future.
Authors
- Bernard Dion
- Guilherme Goretkin
- Francois Xavier Dormoy
Publication Details
- Published
- 2025-05-20
- DOI
- https://doi.org/10.4050/f-0081-2025-381
- Primary Topic
- Manufacturing Process and Optimization
- Type
- article
- Field-Weighted Citation Impact
- 0.00