Integrating process and demand uncertainty in capacity planning for next-generation pharmaceutical supply chains

Emerging sectors within the biopharmaceutical industry are undergoing rapid scale-up due to the market boom of gene therapies and vaccine platform technologies. Manufacturers are pressured to orchestrate resources and plan investments under future demand uncertainty and, critically, an early-stage process uncertainty for platforms still under development. In this work, a multi-product multi-stage stochastic optimization problem integrating demand uncertainty is presented and augmented with a worst-case optimization approach with respect to process uncertainty. Results focus on a comparison between fixed equipment facilities and modular technologies, highlighting an inherent flexibility of the latter option due to shorter recourse actions for capacity scale-out. The impact of process uncertainty integration is quantified. With more conservative decisions taken in first-stages of the time horizon, expected costs result lower for modular single-use equipment. This suggests that capacity adjustments also help adapt to varying process performance and reduce the propagation conservative design decisions.

Authors

Institutions

Publication Details

Journal
Systems and Control Transactions
Published
2025-06-30
DOI
https://doi.org/10.69997/sct.162819
Primary Topic
Process Optimization and Integration
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Integrating process and demand uncertainty in capacity planning for next-generation pharmaceutical supply chains

Miriam Sarkis, Maria M. Papathanasiou, Nilay Shah
Systems and Control Transactions
Process Optimization and Integration
article

Integrating process and demand uncertainty in capacity planning for next-generation pharmaceutical supply chains

Miriam Sarkis, Maria M. Papathanasiou, Nilay Shah
article en

Abstract

Emerging sectors within the biopharmaceutical industry are undergoing rapid scale-up due to the market boom of gene therapies and vaccine platform technologies. Manufacturers are pressured to orchestrate resources and plan investments under future demand uncertainty and, critically, an early-stage process uncertainty for platforms still under development. In this work, a multi-product multi-stage stochastic optimization problem integrating demand uncertainty is presented and augmented with a worst-case optimization approach with respect to process uncertainty. Results focus on a comparison between fixed equipment facilities and modular technologies, highlighting an inherent flexibility of the latter option due to shorter recourse actions for capacity scale-out. The impact of process uncertainty integration is quantified. With more conservative decisions taken in first-stages of the time horizon, expected costs result lower for modular single-use equipment. This suggests that capacity adjustments also help adapt to varying process performance and reduce the propagation conservative design decisions.

Systems and Control TransactionsVol. 4
Imperial College London (GB)
Openalex Percentile: Top 83%
Process Optimization and Integration
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.