Integrating process and demand uncertainty in capacity planning for next-generation pharmaceutical supply chains
Emerging sectors within the biopharmaceutical industry are undergoing rapid scale-up due to the market boom of gene therapies and vaccine platform technologies. Manufacturers are pressured to orchestrate resources and plan investments under future demand uncertainty and, critically, an early-stage process uncertainty for platforms still under development. In this work, a multi-product multi-stage stochastic optimization problem integrating demand uncertainty is presented and augmented with a worst-case optimization approach with respect to process uncertainty. Results focus on a comparison between fixed equipment facilities and modular technologies, highlighting an inherent flexibility of the latter option due to shorter recourse actions for capacity scale-out. The impact of process uncertainty integration is quantified. With more conservative decisions taken in first-stages of the time horizon, expected costs result lower for modular single-use equipment. This suggests that capacity adjustments also help adapt to varying process performance and reduce the propagation conservative design decisions.
Authors
- Miriam Sarkis (ORCID: https://orcid.org/0000-0002-8575-8544)
- Maria M. Papathanasiou (ORCID: https://orcid.org/0000-0002-8886-0624)
- Nilay Shah (ORCID: https://orcid.org/0000-0003-3766-3572)
Institutions
- Imperial College London (GB)
Publication Details
- Journal
- Systems and Control Transactions
- Published
- 2025-06-30
- DOI
- https://doi.org/10.69997/sct.162819
- Primary Topic
- Process Optimization and Integration
- Type
- article
- Field-Weighted Citation Impact
- 0.00