Numerical Analysis of Cement Placement into Drilling Fluid in Oilwell Applications

Understanding the displacement mechanism of cement slurry in drilling fluid is crucial for enhancing the safety of oil well cementing and mitigating geotechnical risks. This study investigated the oil well cementing process by simulating the displacement of drilling fluid by cement slurry in the annular space between the well casing and the surrounding formations using computational fluid dynamics (CFD). The volume-of-fluid (VOF) method in ANSYS-Fluent was employed to track the interfaces between drilling fluid, spacer fluid, and cement slurry. The study simulated fluid motion during drilling operations in the oil and gas industry, considering both smooth and irregular annular geometries around wells. The results show that the efficiency of cement slurry in displacing drilling fluid is higher in Case-2 (irregular outer walls) than in Case-1 (smooth outer walls). Under various inlet velocity conditions in Case-2, an optimal filling rate was achieved at an inlet velocity of 0.5 m/s. When the inlet velocity of the cement slurry was 0.2 m/s, a higher cement content was observed compared to 0.05 m/s, although some recirculation regions were more likely to form at this velocity.

Authors

Institutions

Publication Details

Journal
Materials
Published
2025-06-30
DOI
https://doi.org/10.3390/ma18133098
Citations
1
Primary Topic
Drilling and Well Engineering
Type
article
Field-Weighted Citation Impact
1.15

Funders

Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Numerical Analysis of Cement Placement into Drilling Fluid in Oilwell Applications

Chengcheng Tao, Goodarz Ahmadi, Mehrdad Massoudi, Qian Wang
1 citations
Materials
Drilling and Well Engineering
1.15
article

Numerical Analysis of Cement Placement into Drilling Fluid in Oilwell Applications

Chengcheng Tao, Goodarz Ahmadi, Mehrdad Massoudi, Qian Wang
article en
1 citations

Abstract

Understanding the displacement mechanism of cement slurry in drilling fluid is crucial for enhancing the safety of oil well cementing and mitigating geotechnical risks. This study investigated the oil well cementing process by simulating the displacement of drilling fluid by cement slurry in the annular space between the well casing and the surrounding formations using computational fluid dynamics (CFD). The volume-of-fluid (VOF) method in ANSYS-Fluent was employed to track the interfaces between drilling fluid, spacer fluid, and cement slurry. The study simulated fluid motion during drilling operations in the oil and gas industry, considering both smooth and irregular annular geometries around wells. The results show that the efficiency of cement slurry in displacing drilling fluid is higher in Case-2 (irregular outer walls) than in Case-1 (smooth outer walls). Under various inlet velocity conditions in Case-2, an optimal filling rate was achieved at an inlet velocity of 0.5 m/s. When the inlet velocity of the cement slurry was 0.2 m/s, a higher cement content was observed compared to 0.05 m/s, although some recirculation regions were more likely to form at this velocity.

MaterialsVol. 18(13)
Clarkson University (US), Purdue University West Lafayette (US), Carnegie Mellon University (US)
National Science Foundation, American Concrete Institute Foundation, National Academies of Sciences, Engineering, and Medicine, American Chemical Society Petroleum Research Fund, Gulf Research Program
Industry, innovation and infrastructure
Openalex Percentile: Top 22%
Drilling and Well Engineering
1.15
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.