IGWO-SVM: An Enhanced Cost Prediction Model for Construction Projects
Accurate cost prediction is crucial for successful construction project management.This study proposes an improved Grey Wolf Optimizer-Support Vector Machine (IGWO-SVM) model for construction project cost prediction.The model incorporates Tent mapping and quantum well techniques to enhance the global search capability and prediction accuracy.Experimental results show that the IGWO-SVM model achieves a prediction error rate of 0.01%, significantly outperforming traditional methods.The model reduced total construction days by 1.72%, total cost by 1.89%, and improved quality levels by 15.31% on average.The IGWO-SVM model demonstrates high stability and accuracy, providing a reliable tool for construction project cost prediction and optimization.
Institutions
- Southwest Jiaotong University (CN)
Publication Details
- Journal
- Tehnicki vjesnik - Technical Gazette
- Published
- 2025-06-30
- DOI
- https://doi.org/10.17559/tv-20240721001870
- Primary Topic
- BIM and Construction Integration
- Type
- article
- Field-Weighted Citation Impact
- 0.00