AVOIDING VS. ACCEPTING RISK: EVALUATING THE RISK MANAGEMENT OF A MOSQUE CONSTRUCTION IN KUALA LUMPUR

Risk management is a critical component in ensuring the successful delivery of construction projects, especially in the public sector, where resources, regulations, and stakeholder interests must be carefully balanced. This study examines the practical application of the Garis Panduan Pengurusan Risiko Bagi Projek Kerajaan (Guidelines on Risk Management for Government Projects) through a case study of a mosque construction project in Kuala Lumpur, focusing on two fundamental risk response strategies: avoidance and acceptance of risk. This study examines how risk can be identified, classified, and treated effectively during the construction phase. Data was collected through stakeholder workshops and document analysis, leading to the identification of project-specific risks, including design changes, late approvals, and religious considerations such as qibla direction alignment. The findings demonstrate that by applying the JKR guideline, certain risks can be proactively avoided through early planning, while lower-impact risks can be strategically accepted with monitoring. The study also highlights how unique characteristics of public religious buildings require tailored risk mitigation approaches. Ultimately, this research affirms the relevance and adaptability of the JKR (2017) guideline in guiding systematic risk management in government-funded construction projects and provides practical insights into future implementation.

Authors

Institutions

Publication Details

Journal
Journal of Architecture Planning and Construction Management
Published
2025-06-30
DOI
https://doi.org/10.31436/japcm.v15i1.913
Primary Topic
Construction Project Management and Performance
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

AVOIDING VS. ACCEPTING RISK: EVALUATING THE RISK MANAGEMENT OF A MOSQUE CONSTRUCTION IN KUALA LUMPUR

Naida Rosli, Zaidi Mohamad
Journal of Architecture Planning and Construction Management
Construction Project Management and Performance
article

AVOIDING VS. ACCEPTING RISK: EVALUATING THE RISK MANAGEMENT OF A MOSQUE CONSTRUCTION IN KUALA LUMPUR

Naida Rosli, Zaidi Mohamad
article en

Abstract

Risk management is a critical component in ensuring the successful delivery of construction projects, especially in the public sector, where resources, regulations, and stakeholder interests must be carefully balanced. This study examines the practical application of the Garis Panduan Pengurusan Risiko Bagi Projek Kerajaan (Guidelines on Risk Management for Government Projects) through a case study of a mosque construction project in Kuala Lumpur, focusing on two fundamental risk response strategies: avoidance and acceptance of risk. This study examines how risk can be identified, classified, and treated effectively during the construction phase. Data was collected through stakeholder workshops and document analysis, leading to the identification of project-specific risks, including design changes, late approvals, and religious considerations such as qibla direction alignment. The findings demonstrate that by applying the JKR guideline, certain risks can be proactively avoided through early planning, while lower-impact risks can be strategically accepted with monitoring. The study also highlights how unique characteristics of public religious buildings require tailored risk mitigation approaches. Ultimately, this research affirms the relevance and adaptability of the JKR (2017) guideline in guiding systematic risk management in government-funded construction projects and provides practical insights into future implementation.

Journal of Architecture Planning and Construction ManagementVol. 15(1)
Sultan Abdul Halim Mu'adzam Shah International Islamic University (MY), Jabatan Perkhidmatan Awam Malaysia (MY)
Openalex Percentile: Top 82%
Construction Project Management and Performance
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

AVOIDING VS. ACCEPTING RISK: EVALUATING THE RISK MANAGEMENT OF A MOSQUE CONSTRUCTION IN KUALA LUMPUR — Naida Rosli, Zaidi Mohamad · Journal of Architecture Planning and Construction Management (2025) | TGRS Research Map | TGRS