The modeling of earthquake disaster mitigation in Bulukumba Regency: A stakeholder approach

Bulukumba Regency, located along the Walanae Fault and within a seismic gap zone, indicates the potential for future earthquake recurrence. However, the regional and community capacity to address earthquake hazards remains weak, as evidenced by the lack of regulations accommodating earthquake studies in Bulukumba. This study aimed to design an earthquake mitigation model based on a stakeholder approach in Bulukumba Regency. The methodology employed MACTOR (Matrix of Alternatives for Choice and Trade-Offs), utilizing survey and questionnaire data. The output is a framework for policymakers in earthquake mitigation activities. The results suggested two effective alternative models: (i) a stakeholder formulation model based on role capacity and (ii) a time segmentation model for stakeholder involvement in earthquake mitigation. Based on these two models, it is essential to establish strong coordination and collaboration among these actors in order to minimize the impact of disasters on both the community and the environment.

Authors

Institutions

Publication Details

Journal
Journal of Degraded and Mining Lands Management
Published
2025-06-30
DOI
https://doi.org/10.15243/jdmlm.2025.124.8247
Primary Topic
Geological and Geophysical Studies
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

The modeling of earthquake disaster mitigation in Bulukumba Regency: A stakeholder approach

Harry Hardian Sakti, Suria Darma Tarigan, Boedi Tjahjono, Imas Sukaesih Sitanggang et al.
Journal of Degraded and Mining Lands Management
Geological and Geophysical Studies
article

The modeling of earthquake disaster mitigation in Bulukumba Regency: A stakeholder approach

Harry Hardian Sakti, Suria Darma Tarigan, Boedi Tjahjono, Imas Sukaesih Sitanggang, Despry Nur Annisa Ahmad
article en

Abstract

Bulukumba Regency, located along the Walanae Fault and within a seismic gap zone, indicates the potential for future earthquake recurrence. However, the regional and community capacity to address earthquake hazards remains weak, as evidenced by the lack of regulations accommodating earthquake studies in Bulukumba. This study aimed to design an earthquake mitigation model based on a stakeholder approach in Bulukumba Regency. The methodology employed MACTOR (Matrix of Alternatives for Choice and Trade-Offs), utilizing survey and questionnaire data. The output is a framework for policymakers in earthquake mitigation activities. The results suggested two effective alternative models: (i) a stakeholder formulation model based on role capacity and (ii) a time segmentation model for stakeholder involvement in earthquake mitigation. Based on these two models, it is essential to establish strong coordination and collaboration among these actors in order to minimize the impact of disasters on both the community and the environment.

Journal of Degraded and Mining Lands ManagementVol. 12(4)
IPB University (ID), Universitas Muhammadiyah Jember (ID)
Openalex Percentile: Top 78%
Geological and Geophysical Studies
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.