Analisis Faktor Keterlambatan Pemasangan Meter Baru Menggunakan Metode Decision Tree Pada PT PLN Unit Layanan Pelanggan Daerah Pringgabaya Lombok Timur

PT. PLN (Persero) ULP Pringgabaya is one of the units established by PT PLN to be able to provide direct services to the community in areas with smaller coverage. However, the use of electricity by the community has increased the demand for the installation of new meters. This study aims to analyze the causes of delays in the installation of new meters. In order to classify the highest causes of installation delays, the Decision Tree method is used. The number of data sets used is 700 data with attributes, such as the distance of the location to the PLN network (Meter), electric voltage (Volt), customer contact, SLO (Certificate of Operational Worthiness), Installation and Installation Status. From the calculation results, the acquisition includes Distance <= 37 M from the PLN network, voltage >= 220 Volts, inactive contacts, old SLOs issued, and uninstalled installations. Testing was carried out 10 times using cross validation with 100% accuracy results with an AUC value of 1.00, which means that the use of the decision tree algorithm can be utilized in determining the classification of the causes of delays in the installation of new meters at PT PLN ULP (Customer Service Unit) Pringgabaya. So it can be concluded that the cause of the delay in the installation of new meters at PT PLN ULP (Customer Service Unit) Pringgabaya is not caused by service criteria but is influenced by distance, voltage, and new customer contacts.

Authors

Publication Details

Journal
Jurnal PRINTER Jurnal Pengembangan Rekayasa Informatika dan Komputer
Published
2025-06-30
DOI
https://doi.org/10.29408/jprinter.v3i1.31058
Primary Topic
Management and Optimization Techniques
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Analisis Faktor Keterlambatan Pemasangan Meter Baru Menggunakan Metode Decision Tree Pada PT PLN Unit Layanan Pelanggan Daerah Pringgabaya Lombok Timur

Yahya Yahya, Arnila Sandi Sandi
Jurnal PRINTER Jurnal Pengembangan Rekayasa Informatika dan Komputer
Management and Optimization Techniques
article

Analisis Faktor Keterlambatan Pemasangan Meter Baru Menggunakan Metode Decision Tree Pada PT PLN Unit Layanan Pelanggan Daerah Pringgabaya Lombok Timur

Yahya Yahya, Arnila Sandi Sandi
article en

Abstract

PT. PLN (Persero) ULP Pringgabaya is one of the units established by PT PLN to be able to provide direct services to the community in areas with smaller coverage. However, the use of electricity by the community has increased the demand for the installation of new meters. This study aims to analyze the causes of delays in the installation of new meters. In order to classify the highest causes of installation delays, the Decision Tree method is used. The number of data sets used is 700 data with attributes, such as the distance of the location to the PLN network (Meter), electric voltage (Volt), customer contact, SLO (Certificate of Operational Worthiness), Installation and Installation Status. From the calculation results, the acquisition includes Distance <= 37 M from the PLN network, voltage >= 220 Volts, inactive contacts, old SLOs issued, and uninstalled installations. Testing was carried out 10 times using cross validation with 100% accuracy results with an AUC value of 1.00, which means that the use of the decision tree algorithm can be utilized in determining the classification of the causes of delays in the installation of new meters at PT PLN ULP (Customer Service Unit) Pringgabaya. So it can be concluded that the cause of the delay in the installation of new meters at PT PLN ULP (Customer Service Unit) Pringgabaya is not caused by service criteria but is influenced by distance, voltage, and new customer contacts.

Jurnal PRINTER Jurnal Pengembangan Rekayasa Informatika dan KomputerVol. 3(1)
Openalex Percentile: Top 77%
Management and Optimization Techniques
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.