Task planning method for multirobot collaboration in substation inspection

Efficient equipment inspection is crucial for ensuring the safety of substations. Although inspection robots are widely used, existing single-robot methods often suffer from low efficiency and limited resource utilization. To address these issues, this paper investigates multi-robot task coordination and planning. First, a unified intelligent inspection system is proposed to enable seamless data interaction and collaboration. Next, a task point assignment and path optimization model is developed to minimize energy consumption and time costs through an improved genetic algorithm. Additionally, a deep Q-learning network is employed for collaborative path planning, leveraging the optimized inspection sequences. A 500kV substation is used as a case study to validate the proposed method. The results show that the proposed collaborative approach significantly reduces time costs and improves overall efficiency compared to traditional single-robot schemes, while also demonstrating high adaptability in handling faults and unexpected situations.

Authors

Institutions

Publication Details

Published
2025-06-30
DOI
https://doi.org/10.1117/12.3066990
Primary Topic
Power Line Inspection Robots
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Task planning method for multirobot collaboration in substation inspection

Jiancheng Shi, Fengnian Liu, Guangchao Yang, Wen An et al.
Power Line Inspection Robots
article

Task planning method for multirobot collaboration in substation inspection

Jiancheng Shi, Fengnian Liu, Guangchao Yang, Wen An, Jiang Lin, Yuanyang Zhang
article en

Abstract

Efficient equipment inspection is crucial for ensuring the safety of substations. Although inspection robots are widely used, existing single-robot methods often suffer from low efficiency and limited resource utilization. To address these issues, this paper investigates multi-robot task coordination and planning. First, a unified intelligent inspection system is proposed to enable seamless data interaction and collaboration. Next, a task point assignment and path optimization model is developed to minimize energy consumption and time costs through an improved genetic algorithm. Additionally, a deep Q-learning network is employed for collaborative path planning, leveraging the optimized inspection sequences. A 500kV substation is used as a case study to validate the proposed method. The results show that the proposed collaborative approach significantly reduces time costs and improves overall efficiency compared to traditional single-robot schemes, while also demonstrating high adaptability in handling faults and unexpected situations.

North China Electric Power University (CN), AiSoft Technology (China) (CN)
Openalex Percentile: Top 85%
Power Line Inspection Robots
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Task planning method for multirobot collaboration in substation inspection — Jiancheng Shi, Fengnian Liu, et al. · (2025) | TGRS Research Map | TGRS