A Study of Carbon Emission Quota for Construction Period of Dredging Projects: Case Studies in Guangzhou, Shenzhen, and Malé

This paper develops a model to calculate carbon emissions during the construction period of dredging projects. Carbon emission quotas for various types of dredgers and auxiliary vessels in different construction conditions and geotechnical soil types during the dredging project’s construction period are established, as well as the power consumption quota for management activities. Taking the construction of the main project of the cross-river channel from Shenzhen to Zhongshan (S09)’s foundation trench excavation and channel dredging, the Thilafushi Island reclamation project in Malé, and the second phase of the southern section of the Guangzhou Port Area channel maintenance project (2022–2023) as case studies, the validity of the quotas is verified. During the construction period, under the same dredging soil quality and the same working condition level, the carbon emissions of different types of dredgers are different. Conversely, under different dredging soil qualities and different working condition levels, the carbon emissions for the same dredger or auxiliary vessel are different. The carbon emissions of each dredger or auxiliary vessel increase with the increase in the ship’s specifications. The carbon emissions of dredging projects are huge, with direct carbon emissions accounting for 97%, and indirect carbon emissions from equipment deployment and management activities accounting for 3%, among which the carbon emissions from electricity consumption in management activities account for only 0.3%.

Authors

Institutions

Publication Details

Journal
Buildings
Published
2025-06-29
DOI
https://doi.org/10.3390/buildings15132293
Primary Topic
Environmental Impact and Sustainability
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

A Study of Carbon Emission Quota for Construction Period of Dredging Projects: Case Studies in Guangzhou, Shenzhen, and Malé

Wei Chen, Lijuan Li, Feng Liu, Siming Liang
Buildings
Environmental Impact and Sustainability
article

A Study of Carbon Emission Quota for Construction Period of Dredging Projects: Case Studies in Guangzhou, Shenzhen, and Malé

Wei Chen, Lijuan Li, Feng Liu, Siming Liang
article en

Abstract

This paper develops a model to calculate carbon emissions during the construction period of dredging projects. Carbon emission quotas for various types of dredgers and auxiliary vessels in different construction conditions and geotechnical soil types during the dredging project’s construction period are established, as well as the power consumption quota for management activities. Taking the construction of the main project of the cross-river channel from Shenzhen to Zhongshan (S09)’s foundation trench excavation and channel dredging, the Thilafushi Island reclamation project in Malé, and the second phase of the southern section of the Guangzhou Port Area channel maintenance project (2022–2023) as case studies, the validity of the quotas is verified. During the construction period, under the same dredging soil quality and the same working condition level, the carbon emissions of different types of dredgers are different. Conversely, under different dredging soil qualities and different working condition levels, the carbon emissions for the same dredger or auxiliary vessel are different. The carbon emissions of each dredger or auxiliary vessel increase with the increase in the ship’s specifications. The carbon emissions of dredging projects are huge, with direct carbon emissions accounting for 97%, and indirect carbon emissions from equipment deployment and management activities accounting for 3%, among which the carbon emissions from electricity consumption in management activities account for only 0.3%.

BuildingsVol. 15(13)
Guangdong University of Technology (CN), Guangzhou Maritime College (CN)
Openalex Percentile: Top 86%
Environmental Impact and Sustainability
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.