Specific Risk Modelling Approach Under Permacrisis Conditions: Some Empirical Evidence

The subject of the research is testing, analyzing, and considering the possibility of applying different risk modeling approaches to optimize the effects of investment activities. In order to have a realistic research basis, concrete data from certain markets were used to cover the studied phenomena as efficiently as possible. The aim is to obtain reliable, timely information about the accomplishment of the specific risk modeling approach under permacrisis conditions. Specific results and their significance for science and practice underscore the focus on distinct crisis periods. The findings confirm the practical relevance and advantages of applying EVT and CEVT-based Value-at-Risk models. This is achieved using different confidence levels (90% and 99%) and a 250-day moving window. The novelty of the research lies in the comparative assessment of investment risk in both developed and developing markets under permacrisis conditions, with the strengths and weaknesses of the tested models clearly identified. The study thereby contributes to creating an optimal market environment that supports informed investment decisions regarding expected returns. The limitations of the research reflect the distinct characteristics of developed and developing markets, with a particular challenge being the identification of systemic risk under the prevailing conditions.

Authors

Institutions

Publication Details

Journal
Engineering Economics
Published
2025-06-29
DOI
https://doi.org/10.5755/j01.ee.36.3.34487
Primary Topic
Reservoir Engineering and Simulation Methods
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Specific Risk Modelling Approach Under Permacrisis Conditions: Some Empirical Evidence

Vladimir Djaković, Goran Andjelic, Jelena Ivetić
Engineering Economics
Reservoir Engineering and Simulation Methods
article

Specific Risk Modelling Approach Under Permacrisis Conditions: Some Empirical Evidence

Vladimir Djaković, Goran Andjelic, Jelena Ivetić
article en

Abstract

The subject of the research is testing, analyzing, and considering the possibility of applying different risk modeling approaches to optimize the effects of investment activities. In order to have a realistic research basis, concrete data from certain markets were used to cover the studied phenomena as efficiently as possible. The aim is to obtain reliable, timely information about the accomplishment of the specific risk modeling approach under permacrisis conditions. Specific results and their significance for science and practice underscore the focus on distinct crisis periods. The findings confirm the practical relevance and advantages of applying EVT and CEVT-based Value-at-Risk models. This is achieved using different confidence levels (90% and 99%) and a 250-day moving window. The novelty of the research lies in the comparative assessment of investment risk in both developed and developing markets under permacrisis conditions, with the strengths and weaknesses of the tested models clearly identified. The study thereby contributes to creating an optimal market environment that supports informed investment decisions regarding expected returns. The limitations of the research reflect the distinct characteristics of developed and developing markets, with a particular challenge being the identification of systemic risk under the prevailing conditions.

Engineering EconomicsVol. 36(3)
University of Novi Sad (RS), Educons University (RS)
Openalex Percentile: Top 81%
Reservoir Engineering and Simulation Methods
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Specific Risk Modelling Approach Under Permacrisis Conditions: Some Empirical Evidence — Vladimir Djaković, Goran Andjelic, et al. · Engineering Economics (2025) | TGRS Research Map | TGRS