Analisis Potensi Sampah di Kuantan Singingi untuk Pembangkit Listrik Tenaga Sampah (PLTSa) Landfill Gas (LFG)

Waste Power Plant (PLTSa) is one of the solutions to overcome waste problems and as electricity supply. This study analyzes the technical and economic feasibility of building a PLTSa at the Muaro Sentajo Landfill, Kuantan Singingi Regency, which uses the sanitary landfill method. The organic waste produces landfill gas (LFG), especially methane, which can be used as fuel for power generation. The estimated LFG content was calculated using the U.S. Environmental Protection Agency model and Landfill Gas Emmisions Model (LandGEM) software. The results show that by the end of the operation period, the landfill can produce 2,966,400 m³ of methane gas capable of operating a power plant with output of 2.39 MW. The analysis shows that the project is financially feasible, with a Net Present Value (NPV) of Rp13.8 billion, Benefit-Cost Ratio (BCR) of 1,1648, Internal Rate of Return (IRR) of 14.2%, and Payback Period of 11 years 8.3 months

Authors

Institutions

Publication Details

Journal
JASIEK (Jurnal Aplikasi Sains Informasi Elektronika dan Komputer)
Published
2025-06-17
DOI
https://doi.org/10.26905/jasiek.v7i1.15607
Primary Topic
Landfill Environmental Impact Studies
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Analisis Potensi Sampah di Kuantan Singingi untuk Pembangkit Listrik Tenaga Sampah (PLTSa) Landfill Gas (LFG)

Iswadi Hasyim Rosma, Boy Ihsan, Dicky Pangindra
JASIEK (Jurnal Aplikasi Sains Informasi Elektronika dan Komputer)
Landfill Environmental Impact Studies
article

Analisis Potensi Sampah di Kuantan Singingi untuk Pembangkit Listrik Tenaga Sampah (PLTSa) Landfill Gas (LFG)

Iswadi Hasyim Rosma, Boy Ihsan, Dicky Pangindra
article en

Abstract

Waste Power Plant (PLTSa) is one of the solutions to overcome waste problems and as electricity supply. This study analyzes the technical and economic feasibility of building a PLTSa at the Muaro Sentajo Landfill, Kuantan Singingi Regency, which uses the sanitary landfill method. The organic waste produces landfill gas (LFG), especially methane, which can be used as fuel for power generation. The estimated LFG content was calculated using the U.S. Environmental Protection Agency model and Landfill Gas Emmisions Model (LandGEM) software. The results show that by the end of the operation period, the landfill can produce 2,966,400 m³ of methane gas capable of operating a power plant with output of 2.39 MW. The analysis shows that the project is financially feasible, with a Net Present Value (NPV) of Rp13.8 billion, Benefit-Cost Ratio (BCR) of 1,1648, Internal Rate of Return (IRR) of 14.2%, and Payback Period of 11 years 8.3 months

JASIEK (Jurnal Aplikasi Sains Informasi Elektronika dan Komputer)Vol. 7(1)
Riau University (ID)
Openalex Percentile: Top 82%
Landfill Environmental Impact Studies
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.