Quantity Take-Off Strategies: Reducing Errors in Roadway Construction Estimation

Accurate quantity take-off (QTO) plays a critical role in various phases of bridge construction projects, from bid preparation and cost management to project execution. This essay presents conventional QTO methods and com- pares them with technology-driven methods, namely the use of Bluebeam Revu software. It analyzes how new technology can make quantity take-offs more accurate and efficient. Typical issues such as errors of measurement in manual measurements, incorrect interpretation of plans, and differences in documentation are analyzed in their impact on accuracy of bids and cost overruns. With reviews of literature, case studies, and comparative studies, the study determines the extent to which automation, standard workflow, and integration of software can signifi- cantly reduce QTO-related mistakes. The study draws attention to the role of new QTO technologies to improve estimation accuracy and make processes leading towards better delivery and cost control in bridge construction.

Authors

Institutions

Publication Details

Journal
Journal of Mechanical Civil and Industrial Engineering
Published
2025-06-28
DOI
https://doi.org/10.32996/jmcie.2025.6.3.1
Primary Topic
Infrastructure Maintenance and Monitoring
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Quantity Take-Off Strategies: Reducing Errors in Roadway Construction Estimation

Hemraj Parate, Kishore Bandela, Paniteja Madala
Journal of Mechanical Civil and Industrial Engineering
Infrastructure Maintenance and Monitoring
article

Quantity Take-Off Strategies: Reducing Errors in Roadway Construction Estimation

Hemraj Parate, Kishore Bandela, Paniteja Madala
article en

Abstract

Accurate quantity take-off (QTO) plays a critical role in various phases of bridge construction projects, from bid preparation and cost management to project execution. This essay presents conventional QTO methods and com- pares them with technology-driven methods, namely the use of Bluebeam Revu software. It analyzes how new technology can make quantity take-offs more accurate and efficient. Typical issues such as errors of measurement in manual measurements, incorrect interpretation of plans, and differences in documentation are analyzed in their impact on accuracy of bids and cost overruns. With reviews of literature, case studies, and comparative studies, the study determines the extent to which automation, standard workflow, and integration of software can signifi- cantly reduce QTO-related mistakes. The study draws attention to the role of new QTO technologies to improve estimation accuracy and make processes leading towards better delivery and cost control in bridge construction.

Journal of Mechanical Civil and Industrial EngineeringVol. 6(3)
California State University, Bakersfield (US), Illinois Department of Transportation (US), William James College (US)
Openalex Percentile: Top 84%
Infrastructure Maintenance and Monitoring
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Quantity Take-Off Strategies: Reducing Errors in Roadway Construction Estimation — Hemraj Parate, Kishore Bandela, et al. · Journal of Mechanical Civil and Industrial Engineering (2025) | TGRS Research Map | TGRS