Capital Budgeting in Financial Modeling

<p style="text-align: justify;" align="center"><strong><a href="https://doi.org/10.52340/ekonomisti.2025.02.03"><strong>10.52340/ekonomisti.2025.02.03</strong></a></strong> <p style="text-align: justify;" align="center"><strong>A</strong><strong>nnotation:</strong>The paper discusses the company`s financial budgeting process and methods for evaluating investment projects. The paper provides an analysis of their strengths and weaknesses and identifies ways to overcome these weaknesses. The paper also develops an investment project evaluation model and a computer program for use this model in practice. This tool was used to perform sensitivity analysis and show results of analysis graphically. <p style="text-align: justify;"><strong>Keywords: </strong>Capital budgeting, Payback Period, Net Present Value (NPV), Internal Rate of Return (IRRI), Modified Internal Rate of Return, Profitability Index (PI), and Hurdle Rate of Return. <p style="text-align: center;"><strong>Introduction </strong> <p style="text-align: justify;">Capital budgeting is one of the pivotal tools that evaluate the returns expected from investments projects[1,2]. Using these tools, a company assesses the risks and returns properly and make informed decisions to achieve its objectives. The most firms employ several types of capital – capital components: debt, preferred stock, and common stock. In this case, cost of capital should be weighted average cost of capital, or shortly – WACC, which is one of the most important components of the capital budgeting model, and the calculation of which is based on the weights determined by the target capital structure of the company[6]. <p style="text-align: justify;">The target capital structure describes the mix of debt, preferred stock, and common equity expected to optimize a company’s price. As a company raises new capital, it will focus on maintaining this target or optimal capital structure - the perfect balance between maximising the wealth and worth of the company and minimising its cost of capital. Due to debt cost tax deductibility, debt financing offers the lowest cost of capital. However, too much debt increases the financial risk to shareholders and the <a href="https://www.investopedia.com/terms/r/returnonequity.asp">return on equity</a> that they require. Because of that, companies are trying to have the optimal point at which the marginal benefit of debt equals the marginal cost. Capital budgeting decisions include: 1) decisions on a product, service, facility, or activity; 2) sound estimates of the timing and amount of cash flow for the proposal; 3) a predetermined criterion for making or rejecting a decision. <p style="text-align: justify;">Companies with consistent, stable cash flows can tolerate a much larger debt load and will have a much higher percentage of debt in their optimal capital structure. Conversely, a company with volatile cash flows will have little debt and a large amount of equity. It is difficult to pinpoint the optimal capital structure; therefore, managers have to make decisions within a certain range[6,7]. The task of selecting the optimal capital structure is also complicated by the fact that a healthy blend of debt and equity varies according to the industries involved, line of business, and a firm`s stage of development, and can also vary over time due to external changes in interest rates and regulatory environment. <p style="text-align: justify;">There are two types of factors effected on cost of capital. One is that which the firm can control, and another – cannot. Capital structure policy, dividend policy and investment policy are instruments effecting on capital cost, and the interest rate, market risk premium and tax rates are outside internal control. The company`s goal should be to be as close as possible to the optimal capital budget point, where marginal cost of capital (MCC) equals the incremental expected return. The Figure 1 shows the marginal cost of capital and investment opportunity schedule. <p style="text-align: justify;">The MCC of a company tends to increase as it raises additional capital. As the company makes additional investments with this new capital, returns on its investments will generally decrease as represented by the investment opportunity schedule (IOS). The relationship between the MCC and the IOS gives an overview of the basic decision-making problem that a company has. <p style="text-align: justify;">Businesses could pursue projects and opportunities that might enhance shareholder value and profit. Because business has available the amount of capital for new projects is limited, management intensively uses <a href="https://www.investopedia.com/terms/r/replacement-chain-method.asp">capital budgeting techniques</a>. <p style="text-align: center;"> <img src="http://ekonomisti.tsu.ge/img/lemon1.jpg" alt="" width="512" height="168" /> <p style="text-align: center;" align="center"><strong>Figure 1</strong> <p style="text-align: justify;">There are a number of <a href="https://www.investopedia.com/articles/financial-theory/11/corporate-project-valuation-methods.asp">capital budgeting methods</a>. Among them, the most commonly used are: payback period, discounted payback period, net present value (NPV), internal rate of return (IRR), modified internal rate of return (MIRR), and profitability index[3]. <p style="text-align: center;"><strong>Payback Period</strong> <p style="text-align: justify;">The payback period is a financial analytical tool that defines the length of time necessary to earn back money that has been invested. Calculating the payback period can give an investor some insight into the degree of riskiness that the investment represents. <p style="text-align: justify;">The payback periods of two investment projects are outlined in Table 1. <p style="text-align: center;" align="center"> <img src="http://ekonomisti.tsu.ge/img/lemon2.jpg" alt="" width="390" height="168" /> <p style="text-align: justify;">Each project requires an initial $1,000 investment. But each project varies in payback periods and number of cash flows generated. Which project is the best? Project (A) and (B) have consistently 4 and 3.33 years, but project (A) generates $500 more cash than project (B). The Payback Period method is most useful for comparing projects with nearly equal lives, or for companies that focus on smaller investments, mainly because smaller investments usually don’t involve overly complex calculations. <p style="text-align: justify;">The payback period shows us how long it takes for the return on investment, but it does not show what is the amount of investment’s return, and: it doesn’t accounting for the time value of money, risk factors, financing concerns or the opportunity cost of an investment. For this reason, payback periods calculated for longer-term investments have a greater potential for inaccuracy. Therefore, using the payback period in combination with other capital budgeting methods is far more reliable. <p style="text-align: center;"><strong>Discounted </strong><strong>Payback Period</strong> <p style="text-align: justify;">The discounted payback period is a modified version of the payback period. It is similar to the regular payback period except that the expected cash flows are discounted and take account for the time value of money. In this metric, future cash flows are estimated and adjusted for the project’s cost of capital. <p style="text-align: justify;">There are two steps involved in calculating the discounted payback period. First, we must discount the net cash flows that will occur during each year of the project; and, second, to obtain the discounted payback period, we must subtract the <a href="https://corporatefinanceinstitute.com/resources/valuation/dcf-formula-guide/">discounted cash flows</a> from the initial cost figure - this continues until the initial cost figure becomes zero. <p style="text-align: center;">Table 2 shows one example of discount payback period calculation. <p style="text-align: center;" align="center"> <img src="http://ekonomisti.tsu.ge/img/lemon3.jpg" alt="" width="432" height="197" /> <p style="text-align: center;">In this case, the project’s payback period is 5.16 years (5+ 651/4000= 5 + 0.16 = 5.16). <p style="text-align: justify;">One common disadvantage of both the payback period and discounted payback methods is that it that they ignore the cash flows after the payback period which are serious deficiencies. <p style="text-align: center;"><strong>Net Present Value (NPV)</strong> <p style="text-align: justify;">Net present value takes into consideration all the inflows, outflows, period of time, and risk involved.This method compares the present value of a project’s cash inflow to the present value of its outflows. <a href="https://www.investopedia.com/terms/d/discounting.asp">Discounting</a> the after-tax cash flows by the weighted average cost of capital or hurdle rate of return allows us to determine whether a project will be profitable or not. It also determines how profitable a project will be in comparison with alternatives. In common, Positive NPV should results in positive economic value added (EVA) and positive market value added (MVA). <p style="text-align: justify;">According to NPV rule: all projects with a positive net present value should be accepted, and those that are negative should be rejected. A positive (negative) net present value means that the rate of return on the capital investment is greater (less) than the discount rate used in the analysis. In the case when funds are limited, only projects with the highest discounted value should be accepted. <p style="text-align: justify;">In the case of incompatible projects, as shown in Fig. 2, if the cost of capital is less than 6%, NPV<sub>A</sub> exceeds NPV<sub>B</sub> and project A will be chosen, and if it is higher than 6%, then project B will be chosen. <p style="text-align: center;"><img src="http://ekonomisti.tsu.ge/img/lemon4.jpg" alt="" width="530" height="279" /> <p style="text-align: center;"><strong>Figure 2</strong> <p style="text-align: justify;">The NPV outcome heavily depend on inputs, estimates, and long-term projections of cash flows. Among them is discount rate which reflects the opportunity cost of capital and the associated with the investment. The weighted average cost of capital (WACC), industry benchmarks, or the required rate of return for similar investments can be considered as a discount rate. A higher discount rate will reduce the present value of future cash flows, potentially leading to a lower NPV, while a lower discount rate will have the opposite effect. Therefore, careful consideration should be given to the selection of the discount rate based on the specific context of the investment. <p style="text-align: justify;">NPV is important metrics of an investment project as it gives money measure of benefit of the project to shareholders. NPV can be used to compare a projected rate of return with the <a href="https://www.investopedia.com/terms/h/hurdlerate.asp">hurdle rate</a> required to approve an investment. The discount rate in the NPV formula is a hurdle rate for a project based on a company’s cost of capital, such as the weighted average cost of capital (WACC), and a negative NPV shows that the expected rate of return will fall short of it, meaning that the project will not create value. <p style="text-align: justify;">Considering the fact that many businesses have a fixed budget and sometimes have two or more project options, NPV cannot be used for comparing the projects different in period of time; it doesn’t consider project size or return on investment (ROI<a title="" href="file:///C:/Users/zurabi/Downloads/27-06-2025_20-30-08/%E1%83%9A%E1%83%94%E1%83%9B%E1%83%9D%E1%83%9C%20%E1%83%AF%E1%83%90%E1%83%95%E1%83%90%20+.docx#_ftn1">[1]</a>). It also relies heavily on inputs, estimates, and long-term projections, which can have a significant impact on the outcome of a particular project’s valuation. <p style="text-align: center;"><strong>Internal Rate of Return (IRR)</strong> <p style="text-align: justify;">The Internal Rate of Return (IRR) is the discount rate that makes the <a href="https://corporatefinanceinstitute.com/resources/valuation/net-present-value-npv/">net present value (NPV)</a> of a project zero. The IRR formula is as follows:<strong> </strong> <p style="text-align: center;"> <img src="http://ekonomisti.tsu.ge/img/lemon5.jpg" alt="" width="184" height="53" /> <p style="text-align: justify;">Unlike net present value, the internal rate of return doesn’t give you the return on the initial investment in terms of real dollars. Using IRR exclusively can lead you to make poor investment decisions, especially if comparing two projects with different durations. <p style="text-align: justify;">According with NPV, proposed projects are usually accepted if they have a net positive value. In contrast, IRR is often accepted if the resulting IRR has a higher value compared to the existing cutoff rate or hurdle rate. Projects with a positive net present value also show a higher internal rate of return greater than the base value. <p style="text-align: justify;">Let’s consider a company which hurdle rate is 12%, and one-year project A has an IRR of 25%, whereas five-year project B has an IRR of 15% (Table 3). If the decision is solely based on IRR, this will lead to unwisely choosing project A over B, while its NPV is 3.5 times higher than project A`s NPV. <p style="text-align: center;" align="center"><img src="http://ekonomisti.tsu.ge/img/lemon6.jpg" alt="" width="279" height="177" /> <p style="text-align: justify;">Let`s look at Fig. 1 again. If the cost of capital exceeds 6%, both methods will favor project B. A conflicting situation will arise if the cost of capital is less than 6%, because in this case, the NPV choice favors project A, and with IRR, the choice will be project B, this is when net present value of project B is less than the net value of project A, which would not be correct. <p style="text-align: justify;">Another reason why NPV and IRR give different results in comparing mutually exclusive projects is that the first one considers the cost of capital as the reinvestment rate, and the second one - the IRR rate, which is less realistic. Accordingly, the NPV method is more reliable than IRR. <p style="text-align: justify;">Using IRR exclusively can lead an investor to make poor investment decisions, especially if comparing two projects with different durations. Another very important point about the internal rate of return is that it assumes all positive cash flows of a project will be reinvested at the rate as the project of the <a cost of capital. the internal rate of return not the profitability and cost of a In the case when the of the projects is the use of IRR can lead to an which is from the projects considered in Table <p style="text-align: justify;">In if the projects are then NPV and IRR give the but if they are mutually exclusive projects and, they are by different and then NPV should be used as project <p style="text-align: Modified Internal Rate of Return <p style="text-align: we IRR assumes that all cash flows from an investment are reinvested at the IRR rate. The allows us to a different reinvestment rate for cash flows at a for of cash flows, while IRR can have two for a of cash flows that between negative and positive title="" cash as it shown by Figure <p style="text-align: center;" align="center"> <img alt="" /> <p style="text-align: center;" <p style="text-align: is as <p style="text-align: center;"> <img alt="" /> <p style="text-align: – the future value of positive cash flows at the reinvestment – the present value of negative cash flows at cost of capital. <p style="text-align: are the expected return will be to – rejected. In the is commonly to compare several projects that are mutually In such a case, the project with the highest is the most <p style="text-align: center;" align="center"><img alt="" /> <p style="text-align: the projects are of equal size and then as shown in Table 1) 2) and 3) and in other in this case, is between the regular IRR, and NPV. <p style="text-align: <p style="text-align: justify;">The Profitability Index the between the present value of future cash flows and the initial investment. The used for investment projects and the value of investment. The profitability considers the time value of money, allows companies to compare projects with different and companies with capital It takes into consideration the time value of money and the risk of future <a flows</a> the cost of capital. <p style="text-align: justify;">The formula for the is as <p style="text-align: center;"><img alt="" /> <p style="text-align: consider an a company to one in investment projects (Table the cost of which exceeds the amount for investment. <p style="text-align: center;" align="center"> <img alt="" width="512" /> <p style="text-align: can be from this the criterion requires the investment budget to projects and NPV is The NPV gives us choice of and NPV equals which is than the choice according - NPV is an important of an investment project its use in this case, as we have gives the <p style="text-align: justify;">The profitability using the cost of capital as discount rate considers the time value of money, allows companies to compare projects with different and companies with capital investments, which should in the increase in the value of the <p style="text-align: has a significant over the regular IRR. It assumes all at the cost of capital, while IRR – at the rate. - making reinvestment at cost of capital, is more and it gives of project’s If the mutually exclusive projects are equal size and have the then NPV and will lead to the decision. The of NPV over is that it shows how much each project increases the value of the <p style="text-align: <p style="text-align: hurdle rate is the rate of return required on an investment. Hurdle rates give companies about whether they should pursue a specific project - the higher the the higher the hurdle rate. The factors should be considered when the hurdle 2) rate, 3) interest rate, cost of capital, and expected rate of return. It as a tool for management decisions with the of <p style="text-align: justify;">The hurdle rate from IRR. The hurdle rate is a return on investment, while IRR is the rate at which all the net present value of all cash flows from a project will be zero. If project has an internal rate of return that exceeds calculated required return, then it is accepted. <p style="text-align: companies use their <a average cost of capital as a hurdle rate for to making a new investment is back their which would earn their as the rate of return. in their their the opportunity cost of investment. <p style="text-align: justify;">The is calculated by the cost of each capital according to its in the capital structure. If a company`s is and the risk premium for a particular project is estimated at the hurdle rate for that project would be is a that the return a company must on its projects to its shareholders and debt a company new projects, using the risk premium that these are expected to returns at equal to the company’s cost of capital the risk The for these is shown in Table <p style="text-align: justify;">Another of at the hurdle rate is that the required rate of return from a Therefore, project the company in must be equal to or greater than its cost of capital. investments generally have greater hurdle rates than less because more risk requires more risk <p style="text-align: evaluate an investment by a <a cash flow analysis we to use the hurdle rate. The analysis method uses the of the time value of money to all future cash flows and then discount them back to value to the net present value. of financial model using the hurdle rate in analysis is in Table This <p style="text-align: shown in this if a hurdle rate of is the investment opportunity has a net present value of This means if the cost of making the investment is than then its expected return will the hurdle rate, and the project can be accepted. If the cost is more than then the expected return will be lower than the hurdle rate, then the project will not be accepted. <p style="text-align: center;"> <img alt="" /> <p style="text-align: Project <p style="text-align: the model of project This model is in for for the This model allows us to and all all investment (Table <p style="text-align: of are in Figure on this the model generates and balance and cash flow and The value is not the cash flows from business but they are incremental value expected from new investment projects. increases are by the rate of which is and the cost of funds - cost of capital - <p style="text-align: center;" align="center"><img alt="" /> <p style="text-align: center;" align="center"><strong>Figure <p style="text-align: center;"> <img alt="" /> <p style="text-align: center;"><img alt="" /> <p style="text-align: model two or the The estimates results based on the given in Figure 1 are in Table <p style="text-align: center;" align="center"><img alt="" /> <p style="text-align: can be from this the internal rate of return of both projects, and are higher than the hurdle rate, which is a more because of is higher than is higher than and the rate of is higher than the of The of is only by the accounting rate of return, to but this is less of the increase in the economic value of the <p style="text-align: justify;">Another important of the investment analysis and model is sensitivity which allows us to the impact on the investment outcome of changes in the that are in the model In this case, these are the the of and the cost of This analysis to the of project <p style="text-align: center;"><img alt="" /> <p style="text-align: 5 <p style="text-align: if certain not occur as analysis is a that can show us the impact of changes in project on the project As can be from this figure the value of the NPV of a given investment project on the of the model, which is and should be into account when making a investment decision. The analysis should be to the other such as IRR, and <p style="text-align: </strong> <p style="text-align: we have each of the capital budgeting methods has and The Payback Period is and shows the of the investment. But it doesn’t account for the time value of money or the value of cash flows after the payback period. The Payback Period the time value of money but doesn’t account for cash flows after the payback period. NPV is important because it gives a measure of benefit of the project to A positive (negative) Net Present Value means that the rate of return on the capital investment is greater (less) than the discount rate used in the analysis. In the case when funds are limited, only projects with the highest discounted value should be accepted and all positive NPV projects be we should look at NPV as the measure of As for IRR and they also measure but in percentage which many decision has an over IRR because it takes into account that the reinvestment rate not be equal to the IRR of return. For decision the profitability is also and shows how much is expected to be of money which is for comparing projects. <p style="text-align: the projects are mutually then the NPV, IRR, and methods will have the decision on whether to or the If projects are mutually then the of projects can be and to make the additional will to be <p style="text-align: capital budgeting method should you is one has and and some companies often use all of this is not difficult to with the of computer which is by Table which is the of the for this This increases the of project evaluation and the of the decision because each one provides a different on the capital investment <p style="text-align: justify;">The of the project evaluation on several of the evaluation In case, these 1) 2) cost of and 3) cost Figure As can be from figure the of the project evaluation is to the of the estimated model, therefore, this should be properly into account in the of the investment project’s value. <p style="text-align: the NPV of all existing investment projects is determined and the available amount of required for their is also it is possible to use the method and determine the optimal capital <p style="text-align: investment project’s cost of capital and hurdle rate <p style="text-align: center;"> <img alt="" /> <p style="text-align: center;"> style="text-align: <p style="text-align: <p style="text-align: <p style="text-align: and <p style="text-align: in <p style="text-align: and 2, <p style="text-align: of target capital The case of debt and equity of <p style="text-align: of capital A financial <a style="text-align: /> <a title="" = value of investment – of of <a title="" – cash flows that many – when by a of cash

Authors

Institutions

Publication Details

Journal
EKONOMISTI
Published
2025-06-29
DOI
https://doi.org/10.52340/ekonomisti.2025.02.03
Primary Topic
Capital Investment and Risk Analysis
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Capital Budgeting in Financial Modeling

Givi Lemonjava
EKONOMISTI
Capital Investment and Risk Analysis
article

Capital Budgeting in Financial Modeling

Givi Lemonjava
article en

Abstract

<p style="text-align: justify;" align="center"><strong><a href="https://doi.org/10.52340/ekonomisti.2025.02.03"><strong>10.52340/ekonomisti.2025.02.03</strong></a></strong> <p style="text-align: justify;" align="center"><strong>A</strong><strong>nnotation:</strong>The paper discusses the company`s financial budgeting process and methods for evaluating investment projects. The paper provides an analysis of their strengths and weaknesses and identifies ways to overcome these weaknesses. The paper also develops an investment project evaluation model and a computer program for use this model in practice. This tool was used to perform sensitivity analysis and show results of analysis graphically. <p style="text-align: justify;"><strong>Keywords: </strong>Capital budgeting, Payback Period, Net Present Value (NPV), Internal Rate of Return (IRRI), Modified Internal Rate of Return, Profitability Index (PI), and Hurdle Rate of Return. <p style="text-align: center;"><strong>Introduction </strong> <p style="text-align: justify;">Capital budgeting is one of the pivotal tools that evaluate the returns expected from investments projects[1,2]. Using these tools, a company assesses the risks and returns properly and make informed decisions to achieve its objectives. The most firms employ several types of capital – capital components: debt, preferred stock, and common stock. In this case, cost of capital should be weighted average cost of capital, or shortly – WACC, which is one of the most important components of the capital budgeting model, and the calculation of which is based on the weights determined by the target capital structure of the company[6]. <p style="text-align: justify;">The target capital structure describes the mix of debt, preferred stock, and common equity expected to optimize a company’s price. As a company raises new capital, it will focus on maintaining this target or optimal capital structure - the perfect balance between maximising the wealth and worth of the company and minimising its cost of capital. Due to debt cost tax deductibility, debt financing offers the lowest cost of capital. However, too much debt increases the financial risk to shareholders and the <a href="https://www.investopedia.com/terms/r/returnonequity.asp">return on equity</a> that they require. Because of that, companies are trying to have the optimal point at which the marginal benefit of debt equals the marginal cost. Capital budgeting decisions include: 1) decisions on a product, service, facility, or activity; 2) sound estimates of the timing and amount of cash flow for the proposal; 3) a predetermined criterion for making or rejecting a decision. <p style="text-align: justify;">Companies with consistent, stable cash flows can tolerate a much larger debt load and will have a much higher percentage of debt in their optimal capital structure. Conversely, a company with volatile cash flows will have little debt and a large amount of equity. It is difficult to pinpoint the optimal capital structure; therefore, managers have to make decisions within a certain range[6,7]. The task of selecting the optimal capital structure is also complicated by the fact that a healthy blend of debt and equity varies according to the industries involved, line of business, and a firm`s stage of development, and can also vary over time due to external changes in interest rates and regulatory environment. <p style="text-align: justify;">There are two types of factors effected on cost of capital. One is that which the firm can control, and another – cannot. Capital structure policy, dividend policy and investment policy are instruments effecting on capital cost, and the interest rate, market risk premium and tax rates are outside internal control. The company`s goal should be to be as close as possible to the optimal capital budget point, where marginal cost of capital (MCC) equals the incremental expected return. The Figure 1 shows the marginal cost of capital and investment opportunity schedule. <p style="text-align: justify;">The MCC of a company tends to increase as it raises additional capital. As the company makes additional investments with this new capital, returns on its investments will generally decrease as represented by the investment opportunity schedule (IOS). The relationship between the MCC and the IOS gives an overview of the basic decision-making problem that a company has. <p style="text-align: justify;">Businesses could pursue projects and opportunities that might enhance shareholder value and profit. Because business has available the amount of capital for new projects is limited, management intensively uses <a href="https://www.investopedia.com/terms/r/replacement-chain-method.asp">capital budgeting techniques</a>. <p style="text-align: center;"> <img src="http://ekonomisti.tsu.ge/img/lemon1.jpg" alt="" width="512" height="168" /> <p style="text-align: center;" align="center"><strong>Figure 1</strong> <p style="text-align: justify;">There are a number of <a href="https://www.investopedia.com/articles/financial-theory/11/corporate-project-valuation-methods.asp">capital budgeting methods</a>. Among them, the most commonly used are: payback period, discounted payback period, net present value (NPV), internal rate of return (IRR), modified internal rate of return (MIRR), and profitability index[3]. <p style="text-align: center;"><strong>Payback Period</strong> <p style="text-align: justify;">The payback period is a financial analytical tool that defines the length of time necessary to earn back money that has been invested. Calculating the payback period can give an investor some insight into the degree of riskiness that the investment represents. <p style="text-align: justify;">The payback periods of two investment projects are outlined in Table 1. <p style="text-align: center;" align="center"> <img src="http://ekonomisti.tsu.ge/img/lemon2.jpg" alt="" width="390" height="168" /> <p style="text-align: justify;">Each project requires an initial $1,000 investment. But each project varies in payback periods and number of cash flows generated. Which project is the best? Project (A) and (B) have consistently 4 and 3.33 years, but project (A) generates $500 more cash than project (B). The Payback Period method is most useful for comparing projects with nearly equal lives, or for companies that focus on smaller investments, mainly because smaller investments usually don’t involve overly complex calculations. <p style="text-align: justify;">The payback period shows us how long it takes for the return on investment, but it does not show what is the amount of investment’s return, and: it doesn’t accounting for the time value of money, risk factors, financing concerns or the opportunity cost of an investment. For this reason, payback periods calculated for longer-term investments have a greater potential for inaccuracy. Therefore, using the payback period in combination with other capital budgeting methods is far more reliable. <p style="text-align: center;"><strong>Discounted </strong><strong>Payback Period</strong> <p style="text-align: justify;">The discounted payback period is a modified version of the payback period. It is similar to the regular payback period except that the expected cash flows are discounted and take account for the time value of money. In this metric, future cash flows are estimated and adjusted for the project’s cost of capital. <p style="text-align: justify;">There are two steps involved in calculating the discounted payback period. First, we must discount the net cash flows that will occur during each year of the project; and, second, to obtain the discounted payback period, we must subtract the <a href="https://corporatefinanceinstitute.com/resources/valuation/dcf-formula-guide/">discounted cash flows</a> from the initial cost figure - this continues until the initial cost figure becomes zero. <p style="text-align: center;">Table 2 shows one example of discount payback period calculation. <p style="text-align: center;" align="center"> <img src="http://ekonomisti.tsu.ge/img/lemon3.jpg" alt="" width="432" height="197" /> <p style="text-align: center;">In this case, the project’s payback period is 5.16 years (5+ 651/4000= 5 + 0.16 = 5.16). <p style="text-align: justify;">One common disadvantage of both the payback period and discounted payback methods is that it that they ignore the cash flows after the payback period which are serious deficiencies. <p style="text-align: center;"><strong>Net Present Value (NPV)</strong> <p style="text-align: justify;">Net present value takes into consideration all the inflows, outflows, period of time, and risk involved.This method compares the present value of a project’s cash inflow to the present value of its outflows. <a href="https://www.investopedia.com/terms/d/discounting.asp">Discounting</a> the after-tax cash flows by the weighted average cost of capital or hurdle rate of return allows us to determine whether a project will be profitable or not. It also determines how profitable a project will be in comparison with alternatives. In common, Positive NPV should results in positive economic value added (EVA) and positive market value added (MVA). <p style="text-align: justify;">According to NPV rule: all projects with a positive net present value should be accepted, and those that are negative should be rejected. A positive (negative) net present value means that the rate of return on the capital investment is greater (less) than the discount rate used in the analysis. In the case when funds are limited, only projects with the highest discounted value should be accepted. <p style="text-align: justify;">In the case of incompatible projects, as shown in Fig. 2, if the cost of capital is less than 6%, NPV<sub>A</sub> exceeds NPV<sub>B</sub> and project A will be chosen, and if it is higher than 6%, then project B will be chosen. <p style="text-align: center;"><img src="http://ekonomisti.tsu.ge/img/lemon4.jpg" alt="" width="530" height="279" /> <p style="text-align: center;"><strong>Figure 2</strong> <p style="text-align: justify;">The NPV outcome heavily depend on inputs, estimates, and long-term projections of cash flows. Among them is discount rate which reflects the opportunity cost of capital and the associated with the investment. The weighted average cost of capital (WACC), industry benchmarks, or the required rate of return for similar investments can be considered as a discount rate. A higher discount rate will reduce the present value of future cash flows, potentially leading to a lower NPV, while a lower discount rate will have the opposite effect. Therefore, careful consideration should be given to the selection of the discount rate based on the specific context of the investment. <p style="text-align: justify;">NPV is important metrics of an investment project as it gives money measure of benefit of the project to shareholders. NPV can be used to compare a projected rate of return with the <a href="https://www.investopedia.com/terms/h/hurdlerate.asp">hurdle rate</a> required to approve an investment. The discount rate in the NPV formula is a hurdle rate for a project based on a company’s cost of capital, such as the weighted average cost of capital (WACC), and a negative NPV shows that the expected rate of return will fall short of it, meaning that the project will not create value. <p style="text-align: justify;">Considering the fact that many businesses have a fixed budget and sometimes have two or more project options, NPV cannot be used for comparing the projects different in period of time; it doesn’t consider project size or return on investment (ROI<a title="" href="file:///C:/Users/zurabi/Downloads/27-06-2025_20-30-08/%E1%83%9A%E1%83%94%E1%83%9B%E1%83%9D%E1%83%9C%20%E1%83%AF%E1%83%90%E1%83%95%E1%83%90%20+.docx#_ftn1">[1]</a>). It also relies heavily on inputs, estimates, and long-term projections, which can have a significant impact on the outcome of a particular project’s valuation. <p style="text-align: center;"><strong>Internal Rate of Return (IRR)</strong> <p style="text-align: justify;">The Internal Rate of Return (IRR) is the discount rate that makes the <a href="https://corporatefinanceinstitute.com/resources/valuation/net-present-value-npv/">net present value (NPV)</a> of a project zero. The IRR formula is as follows:<strong> </strong> <p style="text-align: center;"> <img src="http://ekonomisti.tsu.ge/img/lemon5.jpg" alt="" width="184" height="53" /> <p style="text-align: justify;">Unlike net present value, the internal rate of return doesn’t give you the return on the initial investment in terms of real dollars. Using IRR exclusively can lead you to make poor investment decisions, especially if comparing two projects with different durations. <p style="text-align: justify;">According with NPV, proposed projects are usually accepted if they have a net positive value. In contrast, IRR is often accepted if the resulting IRR has a higher value compared to the existing cutoff rate or hurdle rate. Projects with a positive net present value also show a higher internal rate of return greater than the base value. <p style="text-align: justify;">Let’s consider a company which hurdle rate is 12%, and one-year project A has an IRR of 25%, whereas five-year project B has an IRR of 15% (Table 3). If the decision is solely based on IRR, this will lead to unwisely choosing project A over B, while its NPV is 3.5 times higher than project A`s NPV. <p style="text-align: center;" align="center"><img src="http://ekonomisti.tsu.ge/img/lemon6.jpg" alt="" width="279" height="177" /> <p style="text-align: justify;">Let`s look at Fig. 1 again. If the cost of capital exceeds 6%, both methods will favor project B. A conflicting situation will arise if the cost of capital is less than 6%, because in this case, the NPV choice favors project A, and with IRR, the choice will be project B, this is when net present value of project B is less than the net value of project A, which would not be correct. <p style="text-align: justify;">Another reason why NPV and IRR give different results in comparing mutually exclusive projects is that the first one considers the cost of capital as the reinvestment rate, and the second one - the IRR rate, which is less realistic. Accordingly, the NPV method is more reliable than IRR. <p style="text-align: justify;">Using IRR exclusively can lead an investor to make poor investment decisions, especially if comparing two projects with different durations. Another very important point about the internal rate of return is that it assumes all positive cash flows of a project will be reinvested at the rate as the project of the <a cost of capital. the internal rate of return not the profitability and cost of a In the case when the of the projects is the use of IRR can lead to an which is from the projects considered in Table <p style="text-align: justify;">In if the projects are then NPV and IRR give the but if they are mutually exclusive projects and, they are by different and then NPV should be used as project <p style="text-align: Modified Internal Rate of Return <p style="text-align: we IRR assumes that all cash flows from an investment are reinvested at the IRR rate. The allows us to a different reinvestment rate for cash flows at a for of cash flows, while IRR can have two for a of cash flows that between negative and positive title="" cash as it shown by Figure <p style="text-align: center;" align="center"> <img alt="" /> <p style="text-align: center;" <p style="text-align: is as <p style="text-align: center;"> <img alt="" /> <p style="text-align: – the future value of positive cash flows at the reinvestment – the present value of negative cash flows at cost of capital. <p style="text-align: are the expected return will be to – rejected. In the is commonly to compare several projects that are mutually In such a case, the project with the highest is the most <p style="text-align: center;" align="center"><img alt="" /> <p style="text-align: the projects are of equal size and then as shown in Table 1) 2) and 3) and in other in this case, is between the regular IRR, and NPV. <p style="text-align: <p style="text-align: justify;">The Profitability Index the between the present value of future cash flows and the initial investment. The used for investment projects and the value of investment. The profitability considers the time value of money, allows companies to compare projects with different and companies with capital It takes into consideration the time value of money and the risk of future <a flows</a> the cost of capital. <p style="text-align: justify;">The formula for the is as <p style="text-align: center;"><img alt="" /> <p style="text-align: consider an a company to one in investment projects (Table the cost of which exceeds the amount for investment. <p style="text-align: center;" align="center"> <img alt="" width="512" /> <p style="text-align: can be from this the criterion requires the investment budget to projects and NPV is The NPV gives us choice of and NPV equals which is than the choice according - NPV is an important of an investment project its use in this case, as we have gives the <p style="text-align: justify;">The profitability using the cost of capital as discount rate considers the time value of money, allows companies to compare projects with different and companies with capital investments, which should in the increase in the value of the <p style="text-align: has a significant over the regular IRR. It assumes all at the cost of capital, while IRR – at the rate. - making reinvestment at cost of capital, is more and it gives of project’s If the mutually exclusive projects are equal size and have the then NPV and will lead to the decision. The of NPV over is that it shows how much each project increases the value of the <p style="text-align: <p style="text-align: hurdle rate is the rate of return required on an investment. Hurdle rates give companies about whether they should pursue a specific project - the higher the the higher the hurdle rate. The factors should be considered when the hurdle 2) rate, 3) interest rate, cost of capital, and expected rate of return. It as a tool for management decisions with the of <p style="text-align: justify;">The hurdle rate from IRR. The hurdle rate is a return on investment, while IRR is the rate at which all the net present value of all cash flows from a project will be zero. If project has an internal rate of return that exceeds calculated required return, then it is accepted. <p style="text-align: companies use their <a average cost of capital as a hurdle rate for to making a new investment is back their which would earn their as the rate of return. in their their the opportunity cost of investment. <p style="text-align: justify;">The is calculated by the cost of each capital according to its in the capital structure. If a company`s is and the risk premium for a particular project is estimated at the hurdle rate for that project would be is a that the return a company must on its projects to its shareholders and debt a company new projects, using the risk premium that these are expected to returns at equal to the company’s cost of capital the risk The for these is shown in Table <p style="text-align: justify;">Another of at the hurdle rate is that the required rate of return from a Therefore, project the company in must be equal to or greater than its cost of capital. investments generally have greater hurdle rates than less because more risk requires more risk <p style="text-align: evaluate an investment by a <a cash flow analysis we to use the hurdle rate. The analysis method uses the of the time value of money to all future cash flows and then discount them back to value to the net present value. of financial model using the hurdle rate in analysis is in Table This <p style="text-align: shown in this if a hurdle rate of is the investment opportunity has a net present value of This means if the cost of making the investment is than then its expected return will the hurdle rate, and the project can be accepted. If the cost is more than then the expected return will be lower than the hurdle rate, then the project will not be accepted. <p style="text-align: center;"> <img alt="" /> <p style="text-align: Project <p style="text-align: the model of project This model is in for for the This model allows us to and all all investment (Table <p style="text-align: of are in Figure on this the model generates and balance and cash flow and The value is not the cash flows from business but they are incremental value expected from new investment projects. increases are by the rate of which is and the cost of funds - cost of capital - <p style="text-align: center;" align="center"><img alt="" /> <p style="text-align: center;" align="center"><strong>Figure <p style="text-align: center;"> <img alt="" /> <p style="text-align: center;"><img alt="" /> <p style="text-align: model two or the The estimates results based on the given in Figure 1 are in Table <p style="text-align: center;" align="center"><img alt="" /> <p style="text-align: can be from this the internal rate of return of both projects, and are higher than the hurdle rate, which is a more because of is higher than is higher than and the rate of is higher than the of The of is only by the accounting rate of return, to but this is less of the increase in the economic value of the <p style="text-align: justify;">Another important of the investment analysis and model is sensitivity which allows us to the impact on the investment outcome of changes in the that are in the model In this case, these are the the of and the cost of This analysis to the of project <p style="text-align: center;"><img alt="" /> <p style="text-align: 5 <p style="text-align: if certain not occur as analysis is a that can show us the impact of changes in project on the project As can be from this figure the value of the NPV of a given investment project on the of the model, which is and should be into account when making a investment decision. The analysis should be to the other such as IRR, and <p style="text-align: </strong> <p style="text-align: we have each of the capital budgeting methods has and The Payback Period is and shows the of the investment. But it doesn’t account for the time value of money or the value of cash flows after the payback period. The Payback Period the time value of money but doesn’t account for cash flows after the payback period. NPV is important because it gives a measure of benefit of the project to A positive (negative) Net Present Value means that the rate of return on the capital investment is greater (less) than the discount rate used in the analysis. In the case when funds are limited, only projects with the highest discounted value should be accepted and all positive NPV projects be we should look at NPV as the measure of As for IRR and they also measure but in percentage which many decision has an over IRR because it takes into account that the reinvestment rate not be equal to the IRR of return. For decision the profitability is also and shows how much is expected to be of money which is for comparing projects. <p style="text-align: the projects are mutually then the NPV, IRR, and methods will have the decision on whether to or the If projects are mutually then the of projects can be and to make the additional will to be <p style="text-align: capital budgeting method should you is one has and and some companies often use all of this is not difficult to with the of computer which is by Table which is the of the for this This increases the of project evaluation and the of the decision because each one provides a different on the capital investment <p style="text-align: justify;">The of the project evaluation on several of the evaluation In case, these 1) 2) cost of and 3) cost Figure As can be from figure the of the project evaluation is to the of the estimated model, therefore, this should be properly into account in the of the investment project’s value. <p style="text-align: the NPV of all existing investment projects is determined and the available amount of required for their is also it is possible to use the method and determine the optimal capital <p style="text-align: investment project’s cost of capital and hurdle rate <p style="text-align: center;"> <img alt="" /> <p style="text-align: center;"> style="text-align: <p style="text-align: <p style="text-align: <p style="text-align: and <p style="text-align: in <p style="text-align: and 2, <p style="text-align: of target capital The case of debt and equity of <p style="text-align: of capital A financial <a style="text-align: /> <a title="" = value of investment – of of <a title="" – cash flows that many – when by a of cash

EKONOMISTI
Tbilisi State University (GE)
Decent work and economic growth
Openalex Percentile: Top 80%
Capital Investment and Risk Analysis
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.