Large Diameter Shafts in Fractured Strata: Equipment and Construction Procedures

This paper promotes the smooth construction of large diameter shafts in fractured strata adjacent to structures by describing a novel technique that combines the use of a shaft boring extension machine (SBEM) with traditional construction methods, including details of both equipment and construction procedures. The specific construction scheme consists of several key steps: launching shaft construction, primary pilot shaft drilling, secondary pilot shaft enlargement excavation with an SBEM, and localized static blasting expansion construction for the outlet shaft. The feasibility of this approach is evaluated through a series of construction effect evaluations. The results indicate that all in situ monitoring items met the relevant requirements, and the scheme had a minimal impact on the adjacent structures and surrounding environment. Furthermore, the scheme reduced construction time by 20.5% compared to the originally planned combination scheme using an RBM and blasting and by 34.0% when excluding the equipment maintenance time. The findings provide fundamental guidance for shaft construction using an SBEM in fractured rock masses.

Authors

Institutions

Publication Details

Journal
Journal of Construction Engineering and Management
Published
2025-06-28
DOI
https://doi.org/10.1061/jcemd4.coeng-16745
Citations
3
Primary Topic
Rock Mechanics and Modeling
Type
article
Field-Weighted Citation Impact
2.59
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Large Diameter Shafts in Fractured Strata: Equipment and Construction Procedures

Junsheng Yang, Xinghua Fang, Wu Zhou, Lanqing Yang et al.
3 citations
Journal of Construction Engineering and Management
Rock Mechanics and Modeling
2.59
article

Large Diameter Shafts in Fractured Strata: Equipment and Construction Procedures

Junsheng Yang, Xinghua Fang, Wu Zhou, Lanqing Yang, Cong Zhang
article en
3 citations

Abstract

This paper promotes the smooth construction of large diameter shafts in fractured strata adjacent to structures by describing a novel technique that combines the use of a shaft boring extension machine (SBEM) with traditional construction methods, including details of both equipment and construction procedures. The specific construction scheme consists of several key steps: launching shaft construction, primary pilot shaft drilling, secondary pilot shaft enlargement excavation with an SBEM, and localized static blasting expansion construction for the outlet shaft. The feasibility of this approach is evaluated through a series of construction effect evaluations. The results indicate that all in situ monitoring items met the relevant requirements, and the scheme had a minimal impact on the adjacent structures and surrounding environment. Furthermore, the scheme reduced construction time by 20.5% compared to the originally planned combination scheme using an RBM and blasting and by 34.0% when excluding the equipment maintenance time. The findings provide fundamental guidance for shaft construction using an SBEM in fractured rock masses.

Journal of Construction Engineering and ManagementVol. 151(9)
Central South University of Forestry and Technology (CN), Sino Biological (China) (CN)
Openalex Percentile: Top 11%
Rock Mechanics and Modeling
2.59
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Large Diameter Shafts in Fractured Strata: Equipment and Construction Procedures — Junsheng Yang, Xinghua Fang, et al. · Journal of Construction Engineering and Management (2025) | TGRS Research Map | TGRS