Parametric Cost Estimating Models for Resurfacing Projects

State DOTs are constantly faced with the challenge of producing accurate cost estimates for highway maintenance projects. Inaccurate estimates can result in financial losses, delays, disputes, and even cancellation of planned projects because of insufficient funding or waste of available funding if it is not used. If a project is approved with an erroneous estimate, budget constraints during execution may cause disputes, delays, quality compromises, and the need for additional funding that strains public resources. Legal disputes over budget overruns can further inflate costs and damage trust among stakeholders. Therefore, accurate methodologies and tools for cost estimation are essential. The goal of this study is to develop parametric models for estimating maintenance project costs with a minimal set of information available at the early phase of project development. To achieve this goal, the study analyzed 11 years of maintenance cost data from the Tennessee Department of Transportation (TDOT) that included various information, such as number of lanes, type of work, treatment type, and location (e.g., county and region). Eleven state-level, eleven region, and nine county-level regression models for maintenance projects were developed from the analysis. The R2 values were calculated to assess the performance of the models. Moreover, the model was validated using an independent dataset, demonstrating reasonable predictive accuracy with an overall mean absolute percentage error (MAPE) of 14.6%. A spreadsheet-based tool was developed to implement the models. The methodology and tool are expected to aid TDOT engineers in estimating maintenance project costs quickly and accurately at the early phase of project development with minimal information.

Authors

Institutions

Publication Details

Journal
Journal of Legal Affairs and Dispute Resolution in Engineering and Construction
Published
2025-06-28
DOI
https://doi.org/10.1061/jladah.ladr-1361
Primary Topic
Construction Project Management and Performance
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Parametric Cost Estimating Models for Resurfacing Projects

Pran K. Paul, Mohammad Moin Uddin, K. Joseph Shrestha
Journal of Legal Affairs and Dispute Resolution in Engineering and Construction
Construction Project Management and Performance
article

Parametric Cost Estimating Models for Resurfacing Projects

Pran K. Paul, Mohammad Moin Uddin, K. Joseph Shrestha
article en

Abstract

State DOTs are constantly faced with the challenge of producing accurate cost estimates for highway maintenance projects. Inaccurate estimates can result in financial losses, delays, disputes, and even cancellation of planned projects because of insufficient funding or waste of available funding if it is not used. If a project is approved with an erroneous estimate, budget constraints during execution may cause disputes, delays, quality compromises, and the need for additional funding that strains public resources. Legal disputes over budget overruns can further inflate costs and damage trust among stakeholders. Therefore, accurate methodologies and tools for cost estimation are essential. The goal of this study is to develop parametric models for estimating maintenance project costs with a minimal set of information available at the early phase of project development. To achieve this goal, the study analyzed 11 years of maintenance cost data from the Tennessee Department of Transportation (TDOT) that included various information, such as number of lanes, type of work, treatment type, and location (e.g., county and region). Eleven state-level, eleven region, and nine county-level regression models for maintenance projects were developed from the analysis. The R2 values were calculated to assess the performance of the models. Moreover, the model was validated using an independent dataset, demonstrating reasonable predictive accuracy with an overall mean absolute percentage error (MAPE) of 14.6%. A spreadsheet-based tool was developed to implement the models. The methodology and tool are expected to aid TDOT engineers in estimating maintenance project costs quickly and accurately at the early phase of project development with minimal information.

Journal of Legal Affairs and Dispute Resolution in Engineering and ConstructionVol. 17(4)
East Tennessee State University (US)
Openalex Percentile: Top 82%
Construction Project Management and Performance
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Parametric Cost Estimating Models for Resurfacing Projects — Pran K. Paul, Mohammad Moin Uddin, et al. · Journal of Legal Affairs and Dispute Resolution in Engineering and Construction (2025) | TGRS Research Map | TGRS