Engineering of a proactive stakeholder culture

This study builds on previous scholarly works that argue that stakeholder management is a normative process and that organisations should develop a proactive stakeholder orientation to get the optimal benefit of stakeholder management. We add to the extant literature by conducting an exploratory, inductive, qualitative case study to improve our understanding of how proactive stakeholder organisations engineer and maintain a culture that supports a proactive stakeholder orientation. We argue that proactive stakeholder culture must be studied because it represents unique and specific philosophical underpinnings rather than ethical or socially responsible cultures. The study makes several contributions to the scholarly literature on stakeholder culture. First, the study builds theoretical generalisations of the phenomenon under consideration. Second, it provides the best practices and content for developing proactive stakeholder cultures. Third, it defines and discovers a critical moderator, i.e., confining pressure, between well-established stakeholder cultural values and psychological stages of ethical decision-making. Finally, the study has an inferential contribution that a strong proactive culture may help organisational members successfully go through the stages of moral decision-making, as Rest (1986) enumerated.

Authors

Institutions

Publication Details

Journal
Journal of business and management.
Published
2025-01-01
DOI
https://doi.org/10.1504/jbm.2025.146955
Primary Topic
Complex Systems and Decision Making
Type
article
Field-Weighted Citation Impact
0.00

Funders

Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Engineering of a proactive stakeholder culture

Mohammad A. Ali, Stephen Jones
Journal of business and management.
Complex Systems and Decision Making
article

Engineering of a proactive stakeholder culture

Mohammad A. Ali, Stephen Jones
article en

Abstract

This study builds on previous scholarly works that argue that stakeholder management is a normative process and that organisations should develop a proactive stakeholder orientation to get the optimal benefit of stakeholder management. We add to the extant literature by conducting an exploratory, inductive, qualitative case study to improve our understanding of how proactive stakeholder organisations engineer and maintain a culture that supports a proactive stakeholder orientation. We argue that proactive stakeholder culture must be studied because it represents unique and specific philosophical underpinnings rather than ethical or socially responsible cultures. The study makes several contributions to the scholarly literature on stakeholder culture. First, the study builds theoretical generalisations of the phenomenon under consideration. Second, it provides the best practices and content for developing proactive stakeholder cultures. Third, it defines and discovers a critical moderator, i.e., confining pressure, between well-established stakeholder cultural values and psychological stages of ethical decision-making. Finally, the study has an inferential contribution that a strong proactive culture may help organisational members successfully go through the stages of moral decision-making, as Rest (1986) enumerated.

Journal of business and management.Vol. 30(1)
Harrisburg University of Science and Technology (US), Pennsylvania Department of Agriculture (US)
University of Pennsylvania, Pennsylvania State University, Penn State Harrisburg, Pennsylvania State University
Openalex Percentile: Top 82%
Complex Systems and Decision Making
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Engineering of a proactive stakeholder culture — Mohammad A. Ali, Stephen Jones · Journal of business and management. (2025) | TGRS Research Map | TGRS