Numerical Simulation Analysis of Reinforcement of a Foundation Pit Tower Crane Installation Station

在目前的加固技术中,型钢转换钢梁替代混凝土支撑梁被广泛应用。以临近武汉长江隧道的某基坑项目为研究对象,采用岩土、隧道结构专用有限元分析软件MIDAS/GEN 2020,对该基坑施工过程中的型钢转换钢梁替代混凝土支撑梁的施工工况进行模拟和受力分析,得到塔吊的工作荷载传到型钢转换钢梁上,再传到钢立柱上各构件的变形及应力情况,并进行分析,得出模型的建立是合理可行的。In the current reinforcement technology, the steel beams to replace the concrete support beam for steel beams are widely used. Taking a foundation pit project near the Wuhan Yangtze River Tunnel as the research object, the MIDAS/GEN 2020 special finite element analysis software of geotechnical and tunnel structures is adopted is adopted for the simulation and force analysis. The working load of the tower crane is passed on to the steel beams, and then passed on to the deformation and stress of each component on the steel pillars. It is also analyzed to obtain the establishment of the model reasonable and feasible.

Authors

Publication Details

Journal
Hans Journal of Civil Engineering
Published
2025-01-01
DOI
https://doi.org/10.12677/hjce.2025.146171
Primary Topic
Engineering Structural Analysis Methods
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Numerical Simulation Analysis of Reinforcement of a Foundation Pit Tower Crane Installation Station

福洪 胡
Hans Journal of Civil Engineering
Engineering Structural Analysis Methods
article

Numerical Simulation Analysis of Reinforcement of a Foundation Pit Tower Crane Installation Station

福洪 胡
article en

Abstract

在目前的加固技术中,型钢转换钢梁替代混凝土支撑梁被广泛应用。以临近武汉长江隧道的某基坑项目为研究对象,采用岩土、隧道结构专用有限元分析软件MIDAS/GEN 2020,对该基坑施工过程中的型钢转换钢梁替代混凝土支撑梁的施工工况进行模拟和受力分析,得到塔吊的工作荷载传到型钢转换钢梁上,再传到钢立柱上各构件的变形及应力情况,并进行分析,得出模型的建立是合理可行的。In the current reinforcement technology, the steel beams to replace the concrete support beam for steel beams are widely used. Taking a foundation pit project near the Wuhan Yangtze River Tunnel as the research object, the MIDAS/GEN 2020 special finite element analysis software of geotechnical and tunnel structures is adopted is adopted for the simulation and force analysis. The working load of the tower crane is passed on to the steel beams, and then passed on to the deformation and stress of each component on the steel pillars. It is also analyzed to obtain the establishment of the model reasonable and feasible.

Hans Journal of Civil EngineeringVol. 14(06)
Sustainable cities and communities
Openalex Percentile: Top 85%
Engineering Structural Analysis Methods
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.