Pengembangan Model Proses Estimasi Biaya Konseptual Pembangunan Trotoar Complete Street Untuk Meningkatkan Akurasi Biaya

The conceptual cost estimation for complete street sidewalk projects represents early-stage budget forecasting, conducted when complete planning data is not yet available. This type of estimation is used by the Provincial Government of DKI Jakarta to propose sidewalk construction budgets over a five-year period through its Strategic Plan. However, the current estimation practices still exhibit a low level of accuracy, leading to inefficiencies in regional development planning and misaligned budget utilization due to shifting priorities. This issue stems from several influencing factors in the estimation process, including scope quality, information quality, estimation procedures, estimator competence, uncertainty, cost information, government regulations, and procurement methods. To improve the accuracy of conceptual cost estimation, it is necessary to develop a model that describes the relationships among these factors and their influence on estimation accuracy. This model can help identify key variables and dominant factors that significantly affect cost estimation outcomes. Using the SEM-PLS method, the study reveals 11 significant relationships among variables involved in the conceptual cost estimation process for complete street sidewalks, with an R² value of 0.308. The analysis also identifies five dominant factors influencing estimation accuracy: information quality, estimation procedures, estimator competence, government regulations, and procurement. Based on these findings, a series of improvement strategies were formulated and compiled into the Technical Guidelines for Conceptual Cost Estimation of Complete Street Sidewalk Projects by the DKI Jakarta Provincial Government.

Authors

Institutions

Publication Details

Journal
Syntax Literate Jurnal Ilmiah Indonesia
Published
2025-06-27
DOI
https://doi.org/10.36418/syntax-literate.v10i6.60608
Primary Topic
Geotechnical and construction materials studies
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Pengembangan Model Proses Estimasi Biaya Konseptual Pembangunan Trotoar Complete Street Untuk Meningkatkan Akurasi Biaya

Eva Andrian Kurniawati, Yusuf Latief
Syntax Literate Jurnal Ilmiah Indonesia
Geotechnical and construction materials studies
article

Pengembangan Model Proses Estimasi Biaya Konseptual Pembangunan Trotoar Complete Street Untuk Meningkatkan Akurasi Biaya

Eva Andrian Kurniawati, Yusuf Latief
article en

Abstract

The conceptual cost estimation for complete street sidewalk projects represents early-stage budget forecasting, conducted when complete planning data is not yet available. This type of estimation is used by the Provincial Government of DKI Jakarta to propose sidewalk construction budgets over a five-year period through its Strategic Plan. However, the current estimation practices still exhibit a low level of accuracy, leading to inefficiencies in regional development planning and misaligned budget utilization due to shifting priorities. This issue stems from several influencing factors in the estimation process, including scope quality, information quality, estimation procedures, estimator competence, uncertainty, cost information, government regulations, and procurement methods. To improve the accuracy of conceptual cost estimation, it is necessary to develop a model that describes the relationships among these factors and their influence on estimation accuracy. This model can help identify key variables and dominant factors that significantly affect cost estimation outcomes. Using the SEM-PLS method, the study reveals 11 significant relationships among variables involved in the conceptual cost estimation process for complete street sidewalks, with an R² value of 0.308. The analysis also identifies five dominant factors influencing estimation accuracy: information quality, estimation procedures, estimator competence, government regulations, and procurement. Based on these findings, a series of improvement strategies were formulated and compiled into the Technical Guidelines for Conceptual Cost Estimation of Complete Street Sidewalk Projects by the DKI Jakarta Provincial Government.

Syntax Literate Jurnal Ilmiah IndonesiaVol. 10(6)
University of Indonesia (ID)
Openalex Percentile: Top 84%
Geotechnical and construction materials studies
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.