Optimized Renovation Strategy for Grounding Systems in Grid Substations: A Cost-Effective Simulation Model Using CYMGRD

The grounding grid in high-voltage substations is essential for ensuring personnel safety, protecting equipment, and maintaining power system reliability. Rapid expansions in electrical infrastructure, including new interconnections, power plants, microgrids, and transmission lines, have increased the stress on grounding systems in aging substations. Older grids are particularly susceptible to elevated fault currents, increased Ground Potential Rise (GPR), and hazardous touch and step potentials due to corrosion and environmental wear, often exceeding original design tolerances. While new grounding designs are well studied, research on optimizing existing grids remains limited. Unlike newly designed substations, retrofitting existing systems faces significant constraints, such as restricted access to live areas, load-management demands, and substantial safety concerns. This study examines these challenges by analyzing a high-voltage substation in Bangladesh, utilizing the CYMGRD simulation tool to design an optimized and economical grounding renovation. Results show that critical safety metrics-including GPR, touch and step potentials, and fault currents-are maintained within safe limits. This research highlights an optimized grounding upgrade approach that addresses both technical and financial limitations in aging substations, offering valuable insights for enhancing grid safety in response to evolving infrastructure demands.

Authors

Publication Details

Published
2025-04-24
DOI
https://doi.org/10.1109/kpec65465.2025.11045049
Primary Topic
Power Systems and Technologies
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Optimized Renovation Strategy for Grounding Systems in Grid Substations: A Cost-Effective Simulation Model Using CYMGRD

Md. Samsul Alam, Md. Mustaeen Billah Anik, Sheikh Tanjir Mahmud
Power Systems and Technologies
article

Optimized Renovation Strategy for Grounding Systems in Grid Substations: A Cost-Effective Simulation Model Using CYMGRD

Md. Samsul Alam, Md. Mustaeen Billah Anik, Sheikh Tanjir Mahmud
article en

Abstract

The grounding grid in high-voltage substations is essential for ensuring personnel safety, protecting equipment, and maintaining power system reliability. Rapid expansions in electrical infrastructure, including new interconnections, power plants, microgrids, and transmission lines, have increased the stress on grounding systems in aging substations. Older grids are particularly susceptible to elevated fault currents, increased Ground Potential Rise (GPR), and hazardous touch and step potentials due to corrosion and environmental wear, often exceeding original design tolerances. While new grounding designs are well studied, research on optimizing existing grids remains limited. Unlike newly designed substations, retrofitting existing systems faces significant constraints, such as restricted access to live areas, load-management demands, and substantial safety concerns. This study examines these challenges by analyzing a high-voltage substation in Bangladesh, utilizing the CYMGRD simulation tool to design an optimized and economical grounding renovation. Results show that critical safety metrics-including GPR, touch and step potentials, and fault currents-are maintained within safe limits. This research highlights an optimized grounding upgrade approach that addresses both technical and financial limitations in aging substations, offering valuable insights for enhancing grid safety in response to evolving infrastructure demands.

Sustainable cities and communities
Openalex Percentile: Top 87%
Power Systems and Technologies
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Optimized Renovation Strategy for Grounding Systems in Grid Substations: A Cost-Effective Simulation Model Using CYMGRD — Md. Samsul Alam, Md. Mustaeen Billah Anik, et al. · (2025) | TGRS Research Map | TGRS