Factors contributing to time delay and cost overrun in the construction of bridges along the Prithvi highway in Nepal

Time delays and cost overruns are a significant issue in infrastructure development, particularly in bridge construction in the Prithvi Highway of Nepal. This research investigates the key factors responsible for these issues, founded on technical, managerial, environmental, and socio-economic factors. Primary data were collected through surveys and interviews with stakeholders of the projects, including engineers, contractors, and government officials, and secondary data were collected from project reports and case studies. Findings indicate that inadequate project planning, poor contract management, insufficient finance, and incorrect resource allocation are key sources of delays and cost overruns. Additional sources are adverse weather, challenging terrain, political instability, and bureaucratic hurdles, which further exacerbate these issues. The study also cites labour shortages and materials price inflation. To meet these challenges, recommendations include formulating project management strategies, enhancing risk assessment mechanisms, and adopting contemporary construction technology. Solving these determinants is imperative to timely and cost-effective bridge construction, and ultimately Nepal's transport system expansion and economic progress.

Authors

Institutions

Publication Details

Journal
IET conference proceedings.
Published
2025-06-27
DOI
https://doi.org/10.1049/icp.2025.1559
Primary Topic
Life Cycle Costing Analysis
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Factors contributing to time delay and cost overrun in the construction of bridges along the Prithvi highway in Nepal

Bhimlal Dhungana, Vanshika Muchhara
IET conference proceedings.
Life Cycle Costing Analysis
article

Factors contributing to time delay and cost overrun in the construction of bridges along the Prithvi highway in Nepal

Bhimlal Dhungana, Vanshika Muchhara
article en

Abstract

Time delays and cost overruns are a significant issue in infrastructure development, particularly in bridge construction in the Prithvi Highway of Nepal. This research investigates the key factors responsible for these issues, founded on technical, managerial, environmental, and socio-economic factors. Primary data were collected through surveys and interviews with stakeholders of the projects, including engineers, contractors, and government officials, and secondary data were collected from project reports and case studies. Findings indicate that inadequate project planning, poor contract management, insufficient finance, and incorrect resource allocation are key sources of delays and cost overruns. Additional sources are adverse weather, challenging terrain, political instability, and bureaucratic hurdles, which further exacerbate these issues. The study also cites labour shortages and materials price inflation. To meet these challenges, recommendations include formulating project management strategies, enhancing risk assessment mechanisms, and adopting contemporary construction technology. Solving these determinants is imperative to timely and cost-effective bridge construction, and ultimately Nepal's transport system expansion and economic progress.

IET conference proceedings.Vol. 2025(7)
Parul University (IN)
Sustainable cities and communities
Openalex Percentile: Top 78%
Life Cycle Costing Analysis
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.