Key factors in TQM implementation for the construction industry

The construction industry is continuously plagued by cost overruns, project delays, and quality deficiencies, and effective quality management strategies are therefore needed. Total Quality Management (TQM) has been found to be a very powerful methodology for improving construction project performance through continuous improvement, stakeholder collaboration, and systematic process optimization. However, TQM implementation in construction is challenging because of the industry's fragmented nature, diverse project requirements, and dynamic work environments. This paper will determine and validate some of the significant factors affecting the implementation of TQM in construction projects and their impact on the outcomes of a project through Analysis of Variance (ANOVA). The study is structured by first reviewing the literature to establish critical factors; second, expert assessment for validation; and third, the ANOVA approach to assess their influence on project outcomes. The present study investigates the relationship between TQM factors and construction project performance through statistical analysis.

Authors

Institutions

Publication Details

Journal
IET conference proceedings.
Published
2025-06-27
DOI
https://doi.org/10.1049/icp.2025.1299
Primary Topic
Technology and Data Analysis
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Key factors in TQM implementation for the construction industry

Jaydeep Pipaliya, Darshit Shah, Pranav Korat
IET conference proceedings.
Technology and Data Analysis
article

Key factors in TQM implementation for the construction industry

Jaydeep Pipaliya, Darshit Shah, Pranav Korat
article en

Abstract

The construction industry is continuously plagued by cost overruns, project delays, and quality deficiencies, and effective quality management strategies are therefore needed. Total Quality Management (TQM) has been found to be a very powerful methodology for improving construction project performance through continuous improvement, stakeholder collaboration, and systematic process optimization. However, TQM implementation in construction is challenging because of the industry's fragmented nature, diverse project requirements, and dynamic work environments. This paper will determine and validate some of the significant factors affecting the implementation of TQM in construction projects and their impact on the outcomes of a project through Analysis of Variance (ANOVA). The study is structured by first reviewing the literature to establish critical factors; second, expert assessment for validation; and third, the ANOVA approach to assess their influence on project outcomes. The present study investigates the relationship between TQM factors and construction project performance through statistical analysis.

IET conference proceedings.Vol. 2025(7)
Parul University (IN)
Industry, innovation and infrastructure
Openalex Percentile: Top 78%
Technology and Data Analysis
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Key factors in TQM implementation for the construction industry — Jaydeep Pipaliya, Darshit Shah, et al. · IET conference proceedings. (2025) | TGRS Research Map | TGRS