The underwater Lamiako tunnel project in Bilbao estuary

The underwater Lamiako Tunnel project, promoted by Biscay Territorial Council (Bilbao, Spain) and currently in an advanced study phase, defines the 4,5 km long road link between the riverbanks of Bilbao estuary. It comprises the two twin-tube tunnel section of 3,5 km and a grade separated junction at each end: Ballonti junction at the left bank, and Artaza junction in a densely populated zone at the right. It will connect the high capacity roads along both riverbanks of the west side of Bilbao Metropolitan area, which at present has only one road connection along the 14 km of the estuary downstream from Bilbao, i.e., Rontegi Bridge. This fact entails four problems in the road network of the area: recurrent congestion, excessive trip distances and time, lack of connections or alternative routes, and vulnerability to accidents and natural hazards. Lamiako Tunnel will close the high capacity roads loop west of Rontegi, in order to solve the mentioned problems. The tunnel will be bored in rock. Ballonti open-air junction is formed by several bridges. Artaza junction, consisting of 6 road branches along more than 2 km, completely underground, thus reducing social and environmental impacts, will be built with diaphragm walls and jet grouting. The project study has required geological, hydrogeological and geotechnical dense field campaign and studies, thorough geometric layout studies and traffic analyses and modelling, and geomechanical and structural design and analysis. Moreover, it is under study the option of partially sharing the road link with a metro-type section, giving thus rise to a multimodal tunnel. The costs of the works are approximately 450 million euro, for which recently the European Investment Bank has granted a 200 million euro loan to the Biscay Council. Features of the project study have permitted to draw several concepts which may contribute to establish a methodology for studies of this type of infrastructures in similar scenarios.

Authors

Institutions

Publication Details

Journal
Transportation research procedia
Published
2025-01-01
DOI
https://doi.org/10.1016/j.trpro.2025.06.097
Primary Topic
Geotechnical Engineering and Underground Structures
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

The underwater Lamiako tunnel project in Bilbao estuary

Miguel de Ortuzar, José María de Ortuzar
Transportation research procedia
Geotechnical Engineering and Underground Structures
article

The underwater Lamiako tunnel project in Bilbao estuary

Miguel de Ortuzar, José María de Ortuzar
article en

Abstract

The underwater Lamiako Tunnel project, promoted by Biscay Territorial Council (Bilbao, Spain) and currently in an advanced study phase, defines the 4,5 km long road link between the riverbanks of Bilbao estuary. It comprises the two twin-tube tunnel section of 3,5 km and a grade separated junction at each end: Ballonti junction at the left bank, and Artaza junction in a densely populated zone at the right. It will connect the high capacity roads along both riverbanks of the west side of Bilbao Metropolitan area, which at present has only one road connection along the 14 km of the estuary downstream from Bilbao, i.e., Rontegi Bridge. This fact entails four problems in the road network of the area: recurrent congestion, excessive trip distances and time, lack of connections or alternative routes, and vulnerability to accidents and natural hazards. Lamiako Tunnel will close the high capacity roads loop west of Rontegi, in order to solve the mentioned problems. The tunnel will be bored in rock. Ballonti open-air junction is formed by several bridges. Artaza junction, consisting of 6 road branches along more than 2 km, completely underground, thus reducing social and environmental impacts, will be built with diaphragm walls and jet grouting. The project study has required geological, hydrogeological and geotechnical dense field campaign and studies, thorough geometric layout studies and traffic analyses and modelling, and geomechanical and structural design and analysis. Moreover, it is under study the option of partially sharing the road link with a metro-type section, giving thus rise to a multimodal tunnel. The costs of the works are approximately 450 million euro, for which recently the European Investment Bank has granted a 200 million euro loan to the Biscay Council. Features of the project study have permitted to draw several concepts which may contribute to establish a methodology for studies of this type of infrastructures in similar scenarios.

Transportation research procediaVol. 90
Ente Vasco de la Energía (ES), SCS Engineers (United States) (US)
Life below water
Openalex Percentile: Top 84%
Geotechnical Engineering and Underground Structures
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.