Determining the Ideal Proportion of Intermittent Renewable Energy in Electricity Market Considering Transmission Line Capacities Using Multi‐Criteria Decision‐Making

ABSTRACT Renewable energy sources (RES) have gained growing interest due to their ability to provide cleaner energy and high‐energy efficiency. However, the integration of RES into electricity markets remains challenging due to their intermittent nature and the merit‐order effect. To tackle the complex task of determining the appropriate share of variable RES for market involvement, this paper introduces a multi‐criteria decision‐making (MCDM) framework that merges the simple additive weighting (SAW) with the analytic hierarchy process (AHP), referred to as AHP‐SAW. This paper proposes one criterion representing transmission lines and five criteria representing the electricity market. By defining these criteria and solving the mathematical model associated with the proposed AHP‐SAW method, the optimal allocation of renewable resources for involvement in the wholesale market is determined, while transmission line constraints are considered. The analysis suggests that increasing the marginal costs for firms leads to different effects on transmission line congestion, depending on the firm in question. While some firms’ higher costs reduce congestion, others may exacerbate it. Also, the results prove that a significant increase in the share of renewable energy sources leads to considerable fluctuations in market prices, with prices even reaching negative values. This issue becomes an obstacle to the profitable participation of traditional units in the market, which in turn creates additional challenges for the system. By the proposed model and according to the priorities of the policymaker, 50%, 60%, and 60% of the maximum permissible share of RES are considered desirable penetration levels for the systems according to three different locations.

Authors

Institutions

Publication Details

Journal
IET Generation Transmission & Distribution
Published
2025-01-01
DOI
https://doi.org/10.1049/gtd2.70109
Citations
1
Primary Topic
Electric Power System Optimization
Type
article
Field-Weighted Citation Impact
0.73
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Determining the Ideal Proportion of Intermittent Renewable Energy in Electricity Market Considering Transmission Line Capacities Using Multi‐Criteria Decision‐Making

Arash Lotfipour, Seyed Saeid Mohtavipour
1 citations
IET Generation Transmission & Distribution
Electric Power System Optimization
0.73
article

Determining the Ideal Proportion of Intermittent Renewable Energy in Electricity Market Considering Transmission Line Capacities Using Multi‐Criteria Decision‐Making

Arash Lotfipour, Seyed Saeid Mohtavipour
article en
1 citations

Abstract

ABSTRACT Renewable energy sources (RES) have gained growing interest due to their ability to provide cleaner energy and high‐energy efficiency. However, the integration of RES into electricity markets remains challenging due to their intermittent nature and the merit‐order effect. To tackle the complex task of determining the appropriate share of variable RES for market involvement, this paper introduces a multi‐criteria decision‐making (MCDM) framework that merges the simple additive weighting (SAW) with the analytic hierarchy process (AHP), referred to as AHP‐SAW. This paper proposes one criterion representing transmission lines and five criteria representing the electricity market. By defining these criteria and solving the mathematical model associated with the proposed AHP‐SAW method, the optimal allocation of renewable resources for involvement in the wholesale market is determined, while transmission line constraints are considered. The analysis suggests that increasing the marginal costs for firms leads to different effects on transmission line congestion, depending on the firm in question. While some firms’ higher costs reduce congestion, others may exacerbate it. Also, the results prove that a significant increase in the share of renewable energy sources leads to considerable fluctuations in market prices, with prices even reaching negative values. This issue becomes an obstacle to the profitable participation of traditional units in the market, which in turn creates additional challenges for the system. By the proposed model and according to the priorities of the policymaker, 50%, 60%, and 60% of the maximum permissible share of RES are considered desirable penetration levels for the systems according to three different locations.

IET Generation Transmission & DistributionVol. 19(1)
University of Guilan (IR)
Openalex Percentile: Top 27%
Electric Power System Optimization
0.73
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Determining the Ideal Proportion of Intermittent Renewable Energy in Electricity Market Considering Transmission Line Capacities Using Multi‐Criteria Decision‐Making — Arash Lotfipour, Seyed Saeid Mohtavipour · IET Generation Transmission & Distribution (2025) | TGRS Research Map | TGRS