An Improved Bi-Objective Randomized Local Search Heuristic for a Resource-Constrained Joint Production & Maintenance Scheduling Problem

Production scheduling, maintenance planning, and resource allocation are three critical tasks managers must address before implementing decisions on the shop floor. This paper examines a bi-objective permutation flow shop scheduling problem that integrates these three aspects. The goal is to determine a production schedule for various jobs, along with maintenance planning and resource supply rate decisions, to minimize both the makespan and total production costs, which encompass maintenance, resource consumption, and resource inventory costs. An improved bi-objective randomized local search (IBORLS) heuristic was developed to generate multiple non-dominated solutions throughout its search process. Computational experiments were conducted to evaluate the heuristic's performance across different problem sizes. The results demonstrate that the developed improvement significantly enhance the heuristic's performance in terms of convergence and the number of solutions obtained.

Authors

Institutions

Publication Details

Published
2024-11-03
DOI
https://doi.org/10.1109/afros62115.2024.11037163
Primary Topic
Management and Optimization Techniques
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

An Improved Bi-Objective Randomized Local Search Heuristic for a Resource-Constrained Joint Production & Maintenance Scheduling Problem

Radhwane Boufellouh, Taha Arbaoui, Fayçal Belkaid
Management and Optimization Techniques
article

An Improved Bi-Objective Randomized Local Search Heuristic for a Resource-Constrained Joint Production & Maintenance Scheduling Problem

Radhwane Boufellouh, Taha Arbaoui, Fayçal Belkaid
article en

Abstract

Production scheduling, maintenance planning, and resource allocation are three critical tasks managers must address before implementing decisions on the shop floor. This paper examines a bi-objective permutation flow shop scheduling problem that integrates these three aspects. The goal is to determine a production schedule for various jobs, along with maintenance planning and resource supply rate decisions, to minimize both the makespan and total production costs, which encompass maintenance, resource consumption, and resource inventory costs. An improved bi-objective randomized local search (IBORLS) heuristic was developed to generate multiple non-dominated solutions throughout its search process. Computational experiments were conducted to evaluate the heuristic's performance across different problem sizes. The results demonstrate that the developed improvement significantly enhance the heuristic's performance in terms of convergence and the number of solutions obtained.

Université Claude Bernard Lyon 1 (FR), University of Abou Bekr Belkaïd (DZ), Institut National des Sciences Appliquées de Lyon (FR)
Openalex Percentile: Top 48%
Management and Optimization Techniques
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.