Flexible Job Shop Scheduling Problem with Job Insertions Based on Graph Neural Networks and Deep Reinforcement Learning

The flexible job shop scheduling problem with job insertions (FJSP-JI) poses significant challenges in real-time industrial environments, where minimizing the maximum completion time (makespan) is critical. To address this, we propose a novel approach that combines heterogeneous graph neural networks (HGNN) and deep reinforcement learning (DRL). A heterogeneous graph is designed to model the complex relationships between machines and operations, capturing both topological and temporal dependencies. The joint decision of operation selection and machine assignment is formulated as a Markov decision process (MDP) and optimized via proximal policy optimization (PPO). Experiments demonstrate that our method has a smaller makespan in addressing the dynamic challenge compared to the classical prioritized scheduling rule. Furthermore, the algorithm exhibits strong generalization capabilities, achieving comparable efficiency on large-scale instances without additional training.

Authors

Institutions

Publication Details

Published
2025-05-05
DOI
https://doi.org/10.1109/cscwd64889.2025.11033234
Primary Topic
Scheduling and Optimization Algorithms
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Flexible Job Shop Scheduling Problem with Job Insertions Based on Graph Neural Networks and Deep Reinforcement Learning

Bowen Song, Chao Lu, Yong Wang
Scheduling and Optimization Algorithms
article

Flexible Job Shop Scheduling Problem with Job Insertions Based on Graph Neural Networks and Deep Reinforcement Learning

Bowen Song, Chao Lu, Yong Wang
article en

Abstract

The flexible job shop scheduling problem with job insertions (FJSP-JI) poses significant challenges in real-time industrial environments, where minimizing the maximum completion time (makespan) is critical. To address this, we propose a novel approach that combines heterogeneous graph neural networks (HGNN) and deep reinforcement learning (DRL). A heterogeneous graph is designed to model the complex relationships between machines and operations, capturing both topological and temporal dependencies. The joint decision of operation selection and machine assignment is formulated as a Markov decision process (MDP) and optimized via proximal policy optimization (PPO). Experiments demonstrate that our method has a smaller makespan in addressing the dynamic challenge compared to the classical prioritized scheduling rule. Furthermore, the algorithm exhibits strong generalization capabilities, achieving comparable efficiency on large-scale instances without additional training.

China University of Geosciences (CN)
Decent work and economic growth
Openalex Percentile: Top 80%
Scheduling and Optimization Algorithms
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.