We address a two-stage chain-reentrant hybrid flow shop problem with deteriorating jobs and two competing agents. Every job must initially be scheduled on a primary machine (first stage) which is then scheduled on one of <tex xmlns:mml="http://www.w3.org/1998/Math/MathML" xmlns:xlink="http://www.w3.org/1999/xlink">$m$</tex> unrelated parallel machines of the second stage and returns back to the primary machine to complete its last operation. The jobs are constrained to a deterioration function linearly depending on their starting times. The objective is to minimize the makespan of the first agent and the total energy consumption of the second one, where each agent has its own set of jobs. We elaborate three meta-heuristics: a nondominated sorting genetic algorithm (NSGA2), an archived multi-objective simulated annealing method (AMOSA), and a particle swarm optimization method (PSO), for the resolution of this problem. An intensive experimental study is conducted to evaluate the performances of the proposed algorithms.

Authors

Institutions

Publication Details

Published
2024-11-03
DOI
https://doi.org/10.1109/afros62115.2024.11037188
Primary Topic
Scheduling and Optimization Algorithms
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

The Chain-Reentrant Hybrid Flow Shop with Two Competing Agents

Nik Mohd Zuki Nik Mohamed, Alireza Mohammad Karim, Mourad Bouterra
Scheduling and Optimization Algorithms
article

The Chain-Reentrant Hybrid Flow Shop with Two Competing Agents

Nik Mohd Zuki Nik Mohamed, Alireza Mohammad Karim, Mourad Bouterra
article en

Abstract

We address a two-stage chain-reentrant hybrid flow shop problem with deteriorating jobs and two competing agents. Every job must initially be scheduled on a primary machine (first stage) which is then scheduled on one of <tex xmlns:mml="http://www.w3.org/1998/Math/MathML" xmlns:xlink="http://www.w3.org/1999/xlink">$m$</tex> unrelated parallel machines of the second stage and returns back to the primary machine to complete its last operation. The jobs are constrained to a deterioration function linearly depending on their starting times. The objective is to minimize the makespan of the first agent and the total energy consumption of the second one, where each agent has its own set of jobs. We elaborate three meta-heuristics: a nondominated sorting genetic algorithm (NSGA2), an archived multi-objective simulated annealing method (AMOSA), and a particle swarm optimization method (PSO), for the resolution of this problem. An intensive experimental study is conducted to evaluate the performances of the proposed algorithms.

University of Sciences and Technology Houari Boumediene (DZ), University of Algiers 3 (DZ)
Openalex Percentile: Top 56%
Scheduling and Optimization Algorithms
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

The Chain-Reentrant Hybrid Flow Shop with Two Competing Agents — Nik Mohd Zuki Nik Mohamed, Alireza Mohammad Karim, et al. · (2024) | TGRS Research Map | TGRS