Swarm-Consensus-Based Human-Machine-Logistics Collaborative Scheduling Method

In the human-centric Industry 5.0 environment, factors such as personalized customer demands and the fuzzy characteristics of task times in human-machine collaborative operations will be further considered, resulting in a type of human-machine-Iogistics collaborative scheduling problem for flexible job shops. This problem involves random arrival times of workpieces, fuzzy processing times, and stringent order deadlines. Such a multi-disturbance manufacturing scenario places higher demands on resource collaboration and scheduling within the workshop. To address this problem, this paper introduces swarm theory and constructs a human-machine-logistics resource task consensus model. A real-time task slackness model is developed based on personalized order characteristics, and a real-time scheduling method considering human-machine-logistics resource consensus is proposed, enabling adaptive real-time collaboration of swarm resources in smart workshops for randomly arriving orders. Finally, the effectiveness of the proposed method is evaluated through simulation case studies.

Authors

Institutions

Publication Details

Published
2025-05-05
DOI
https://doi.org/10.1109/cscwd64889.2025.11033361
Primary Topic
Digital Transformation in Industry
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Swarm-Consensus-Based Human-Machine-Logistics Collaborative Scheduling Method

Xiaoyu Wen, Ye Tian, Sen Li, Guofu Luo et al.
Digital Transformation in Industry
article

Swarm-Consensus-Based Human-Machine-Logistics Collaborative Scheduling Method

Xiaoyu Wen, Ye Tian, Sen Li, Guofu Luo, Boxuan Zhang, Wenchao Yang
article en

Abstract

In the human-centric Industry 5.0 environment, factors such as personalized customer demands and the fuzzy characteristics of task times in human-machine collaborative operations will be further considered, resulting in a type of human-machine-Iogistics collaborative scheduling problem for flexible job shops. This problem involves random arrival times of workpieces, fuzzy processing times, and stringent order deadlines. Such a multi-disturbance manufacturing scenario places higher demands on resource collaboration and scheduling within the workshop. To address this problem, this paper introduces swarm theory and constructs a human-machine-logistics resource task consensus model. A real-time task slackness model is developed based on personalized order characteristics, and a real-time scheduling method considering human-machine-logistics resource consensus is proposed, enabling adaptive real-time collaboration of swarm resources in smart workshops for randomly arriving orders. Finally, the effectiveness of the proposed method is evaluated through simulation case studies.

Zhengzhou University of Light Industry (CN)
Openalex Percentile: Top 80%
Digital Transformation in Industry
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.