Critical Path Method pada Crashing Project Pembangunan Gedung Business Park Citraland City Losari Makassar

Dealing with project delays can be done by accelerating project work, known as crashing projects. This study uses the Critical Path Method (CPM) with the alternative of adding 6.3 hours of overtime per day and adding 25% of the total workforce per work item. This research is conducted by analyzing the network that is on the critical path and accelerating the work items that are on the critical path The purpose of this study is to determine the duration (time) of the project implementation crash, compare the time and cost of project implementation before and after project implementation. In this case, the building studied by the author is the construction project of the Citraland City Losari Makassar Ruko Business Park. The results showed that the duration became 56 days 51% faster than the normal duration of 109 days. Regarding this, the direct cost had changed from Rp. 2,759,614,089.00 to Rp. 2,930,874,985.09. The indirect costs also changed. The initial cost has increased as much as Rp. 127,024,719.08 so that the total project value is Rp. 3,159,567,673.76.

Authors

Institutions

Publication Details

Journal
Jurnal Praktik Keinsinyuran.
Published
2025-05-06
DOI
https://doi.org/10.25170/jpk.v2i2.6418
Primary Topic
Management and Optimization Techniques
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Critical Path Method pada Crashing Project Pembangunan Gedung Business Park Citraland City Losari Makassar

Yanto Yanto, Asdar Sain
Jurnal Praktik Keinsinyuran.
Management and Optimization Techniques
article

Critical Path Method pada Crashing Project Pembangunan Gedung Business Park Citraland City Losari Makassar

Yanto Yanto, Asdar Sain
article en

Abstract

Dealing with project delays can be done by accelerating project work, known as crashing projects. This study uses the Critical Path Method (CPM) with the alternative of adding 6.3 hours of overtime per day and adding 25% of the total workforce per work item. This research is conducted by analyzing the network that is on the critical path and accelerating the work items that are on the critical path The purpose of this study is to determine the duration (time) of the project implementation crash, compare the time and cost of project implementation before and after project implementation. In this case, the building studied by the author is the construction project of the Citraland City Losari Makassar Ruko Business Park. The results showed that the duration became 56 days 51% faster than the normal duration of 109 days. Regarding this, the direct cost had changed from Rp. 2,759,614,089.00 to Rp. 2,930,874,985.09. The indirect costs also changed. The initial cost has increased as much as Rp. 127,024,719.08 so that the total project value is Rp. 3,159,567,673.76.

Jurnal Praktik Keinsinyuran.Vol. 2(2)
Atma Jaya Catholic University of Indonesia (ID)
Sustainable cities and communities
Openalex Percentile: Top 79%
Management and Optimization Techniques
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Critical Path Method pada Crashing Project Pembangunan Gedung Business Park Citraland City Losari Makassar — Yanto Yanto, Asdar Sain · Jurnal Praktik Keinsinyuran. (2025) | TGRS Research Map | TGRS